说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 地质勘察
1)  geological investigation
地质勘察
1.
Application of the electric sounding in geological investigation of mountains;
电测深物探方法在山区工程地质勘察中的应用
2.
Requirements of foundation pit excavation designon geological investigation;
基坑开挖设计中对地质勘察工作的要求
3.
Brief talk on railway geological line selection and project geological investigation in loess area
浅谈黄土地区铁路地质选线与工程地质勘察
2)  Geological exploration
地质勘察
1.
Analysis of complicated stratum encountered in geological exploration of Leikou Bridge;
磊口大桥地质勘察中复杂地层的分析
2.
Research and Application of Information Model on Geological Exploration Based GIS;
基于GIS的地质勘察信息模型研究及其应用
3.
On application of rocks(mass) sonic wave measuring in engineering geological exploration
谈岩石(体)波速测试在工程地质勘察中的应用
3)  Geological survey
地质勘察
1.
Some issues in need of special attention for engineering geological survey of mid-and small-scale hydropower stations in Guangxi;
广西中小型水电站工程地质勘察需注意的一些问题
2.
Some problems that develop with the geological survey of directionally drilled river are summarized and analysed.
对管道定向钻穿越河流的工程地质勘察工作中出现的一些问题进行了总结和探讨,认为勘察钻孔工作量的布置应随场地条件而异,科学合理地安排,而不宜教条地执行规范、规程中的某些条款。
3.
With the highway geological survey means more and more advanced,investigation methods have been greatly improved.
公路地质勘察手段越来越先进,勘察方法也随之有所改进,就红土山段公路滑坡勘察综合现代勘察的手段,根据该地区的实际地质条件布设工作方法和工作量,结合图片判断出该区滑坡的主要要素,是解决疑难地质问题的有效手段。
4)  geological reconnaissance
地质勘察
1.
The application of RS and GIS technology in geological reconnaissance of railway engineering in high-cold mountainous areas;
RS和GIS在高寒山区铁路地质勘察中的应用
2.
Since 1950s, Changjiang Water Resources Commission as well as other scientific research units have carried out engineering geological reconnaissance for large-scale cross structures and the whole route,meantime,researched special subjects,such as special soils(expansive soil,loess),the canal section i.
自20世纪50年代迄今,长江水利委员会及其它科研设计单位对中线工程全线及大型交叉建筑物进行了工程地质勘察,同时对特殊类土(膨胀土、黄土)、渠线过煤矿区、区域构造稳定性、砂土液化等专题进行了研究。
5)  geologic reconnaissance
地质勘察
6)  engineering geological investigation
工程地质勘察
1.
Analysis on several problems in engineering geological investigation for Yangtze dyke;
对长江堤防工程地质勘察几个问题的认识
2.
This paper suggest that the engineering geological investigation of shaft lining rupture can be divided as preliminary and detailed phases, the working contents and methods of each investigation phase is also put forward.
本文建议立井破裂工程地质勘察可划分为初步勘察和详细勘察两阶段 ,提出了各阶段应包含的具体工作内容和工作方法 ;特别是提出要进行模拟土与井壁相互作用试验 ,获得不同埋深土层与井壁相互作用的力学参数 ;提出在勘探阶段判断厚表土层中煤矿立井非采动破裂的系统工作方法。
3.
The engineering geological investigations for pipeline large/middle river crossing is one of the focal point and difficult point in pipeline engineering.
大中型河流管道穿越工程地质勘察是管道线路工程地质勘察的重点与难点之一。
补充资料:坝址工程地质勘察


坝址工程地质勘察
engineering geologic investigation for dam site

  bozh一gongeheng dlzh一korleho坝址工程地质勘察(engineering geologieinvestigation for dam site)为选择坝址和查明坝址工程地质条件所进行的综合调查工作。大坝是水电工程的主要建筑物,其规模、类型及型式的不同,对工程地质条件的要求也是不同的。另外,坝址除大坝外还有厂房、导流隧洞、泄洪隧洞、发电隧洞及溢洪道等其他建筑物。因此,坝址工程地质勘察不仅为大坝,同时还要为其他各种建筑物的设计和施工提供地质资料和工程地质评价。勘察工作是分阶段进行的,各阶段任务、内容、方法及成果是不同的。 勘察任务①规划勘察。主要是配合规划设计选择和确定建坝河段,调查各梯级坝段的工程地质条件,研究近期开发和控制性工程坝区的主要工程地质问题。②可行性研究勘察。在规划选定梯级的坝段,调查研究各比较坝址的工程地质条件,为选择坝址、初选基本坝型提供地质依据。③初步设计勘察。查明选定坝址的工程地质条件,为确定坝型、枢纽布置、坝线及地基处理方案提供地质资料。④技施设计勘察。进行工程地质专题研究.核实前期勘察资料及结论,为设计的调整和优化提供地质资料,并参加地基验收和处理的研究工作,提出施工、运行期地质监测的建议。 勘察内容①规划阶段。主要是了解坝段的河谷形态及地貌,出露地层和岩性及影响建坝的易溶岩、软岩(土)层的分布,构造断裂的发育程度、规模及其与河流方向的关系,岩体风化程度及特征,井、泉的分布及其与岩层、断裂、地貌的关系,河谷内坍滑体等的分布、规模及状态,大范围松散堆积物的来源,喀斯特形态、分布及与地貌、构造的关系,泥石流活动情况及形成条件等。②可行性研究阶段。是调查坝址的岩层分布及其物理力学性质,软弱岩层及夹层性状,各级断裂的分布及其组合,缓倾断裂的分布规律及性状,河床及两岸岩体风化带深度及卸荷范围,坝基岩体及断裂带的渗透性,相对隔水层埋藏深度,地下水类型、水位及动态,河床覆盖层厚度、结构及透水性.喀斯特发育规律,岸坡稳定条件等。③初步设计阶段。主要是查明坝址建筑物范围的覆盖层厚度、组成、渗透性、承载力、压缩变形、渗透比降及液化条件等,基岩的各向异性、变形特征及抗剪强度,软弱岩层或夹层的分布及物理力学性质,控制大坝稳定的断层的规模、产状及其空间变化规律,断层带物质的组成、性状、强度和水化学稳定性,岩体风化卸荷深度及渗透性,喀斯特发育深度,地下水埋深、动态、相对隔水层的埋藏条件,大坝下游抗力体及冲刷部位岩体性质、风化程度及完整性。上述研究内容可根据坝型及具体地质条件有所侧重。④技施设计阶段。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条