说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 巷道卧底机
1)  bottom ripping machine
巷道卧底机
1.
Developing the bottom ripping machine is important for restoration of the destructed bottom which causes by the mine pressure.
在对巷道卧底机的铣刨鼓进行受力分析的基础上,建立了巷道卧底机工作装置的运动学和动力学模型,该模型简单清晰地表达了刀具的工作状态及巷道卧底机工作过程中的整体受力状况,在该模型的基础上,运用机械优化和分析软件分析了工作装置性能参数对铣刨机工作过程的影响,并对铣刨鼓的设计提出指导性建议。
2)  tunnel ripping machine
隧道卧底机
1.
According to the principle of highway road mill machine and mature technology of tunnel loader,propose the plan of develop the tunnel ripping machine,the work installment——mill drum of this machine becomes the most important part to research.
根据高速公路路面铣刨机的工作原理及隧道装载机的成熟技术,提出了开发隧道卧底机的设想,其中隧道卧底机的工作装置——铣刨鼓是关键部件。
3)  roadway floor
巷道底板
1.
To identify the mechanical properties of stabilized slaking mudstone and possibility as base material of roadway floor,a series of experiments were carried out on specimens prepared at different dosages of solidifying-agent and cu.
为避免煤矿巷道底板泥岩泥化物清淤抛弃产生的环境污染问题,提出了将泥岩泥化物快速固化后作为巷道路面基层材料的处理方法,并为此研制了一种高效固化剂。
4)  Floor heave
巷道底鼓
1.
This paper deals with the relationship between the floor heave and the gob height and horizontal tectonic stress in panel No.
4煤矿中第四采区巷道底鼓与采空区和水平地质构造应力之间的关系进行了探讨。
2.
In this paper,three boundary element models were adopted to simulate the preventive effect of different floor bolt layout on the floor heave.
根据研究结果,提出采用在巷道底板上分期安装锚杆的方法,可有效地防治巷道底鼓。
3.
Floor heave is familiar distortion and damage form in deep soft rock roadway, how to control floor heave effectively and economically is an urgent problem.
深井软岩巷道底鼓是常见的变形和破坏形式,如何有效、经济的控制底鼓是深部开采急需解决的问题。
5)  floor heave of roadway
巷道底鼓
1.
Based on the field investigation,model tests and numerical simulation,the features and mechanism of four kinds of floor heave of roadway in deep coal mining are discussed,the major factors affecting the floor heave are analyzed,and recent advance .
在大量现场研究、实验室模拟实验和数值计算的基础上,探讨了巷道底鼓的基本特征,分析了4种类型底鼓的机理及影响因素,综述了我国近年来防治底鼓的有关研究成果,最后介绍了2个防治巷道底鼓的实例。
6)  floor heave
巷道底臌
1.
Base on the in-situ measurements in soft rocks influence of the wall subsiding on roadwayfloor heave is explained.
通过茂名矿区软岩巷道底臌变形实测结果的分析,说明巷道底胶变形受两帮围岩下沉的影响。
2.
This paper delt with the relationship between the floor heave and the gob height and horizontal tectonics stress in panel No.
4煤矿中第四采区巷道底臌与采空区和水平地质构造应力之间的关系进存了探讨。
补充资料:巷道钻进机


巷道钻进机


巷道钻进机擎
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条