说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 大断层
1)  large fault
大断层
1.
By analyzing the case of using cable anchor and reinforcing bar pillars joint supporting technique to pass large fault in 6138 tunnel,the paper has introduced four sides such as the existing problems of cable anchor supporting,the decision of anchor supporting parameter,the construction demands of cable anchor and reinforcing bar pillars joint supporting and its applied effects.
通过在6138机巷采用锚网索钢筋梁联合支护技术过大断层的实例,对锚网支护存在问题、锚杆(索)支护参数确定、锚杆(索)钢筋梁联合支护施工要求及应用效果等四个方面作了分析介绍。
2.
Adopting dependable technique measures at-256 north enlarged area of 18-2 layer face which are advanced in technology reasonable in economy realieblein safety realize continuous mining at layer of large fault,obtain the good and economic and social profits,provide the important practical thevretical basis for deep inclined π face.
-256北扩区18-2层π放工作面采用技术上先进、经济上合理、安全上可靠的措施,实现跨大断层破碎带连续开采,取得了良好的经济效益和社会效益,为今后大倾角煤层π放工作面开采提供了重要的实践和理论依据。
3.
This paper introduces the large fault on 68214 face of Du’erping Coal Mine, and puts forward some technical measures for passing through the large fault and the technical measures for injecting the polymer materials (Malisan N).
介绍了杜儿坪矿68214工作面大断层,提出了通过大断层时采取的技术措施和打注高分子材料(马丽散N)的技术措施。
2)  big fault
大断层
1.
Practice on triangle-orebody mining under big fault;
大断层下三角矿回采实践
2.
Three downhill tunnel get across F8 fracture zone in 3~(rd)district of Liangbaosi mine,they have a variety of adverse environment such as big ground stress, many big fault structural fractures and the corrosion of three ash water.
本文分析研究梁宝寺矿三采区三条下山在施工过程中通过F8断层破碎带,在深井地应力大、大断层构造裂隙多、三灰水浸蚀等多种不利施工环境下,通过采用注浆充填断层裂隙、封堵三灰水、U型钢棚全封闭加强支护、超前管棚超前支护等多种技术措施,三条下山先后安全顺利地通过断层。
3)  Daxing fault
大兴断层
1.
With a complicated cracking system, Daxing fault in Langgu sag controls the mid-west edge and influences the whole hydrocarbon distribution in the sag through the structure pattern and sedimentary characteristics.
廊固凹陷断裂系统复杂,其中大兴断层是中西部的控盆边界断层,它通过对凹陷的构造样式、沉积特征的控制进而影响整个凹陷的油气分布。
4)  megafault
巨大断层
5)  major fault zone
大断层带
6)  dip large fault
倾向大断层
1.
Based on the fact that the Dongpang Mine 2221 face has successfully passed through the dip large fault,this paper points out it is feasible to take reasonable measures according to the actual situation to make elevated fully mechanized coal face pass through the dip large fault.
以东庞矿2221工作面成功通过倾向大断层为依据,阐明了根据实际情况采取合理措施,高架综采面通过倾向大断层的可行性。
补充资料:X线断层照片


X线断层照片


参见"X线 体层摄影"。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条