说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 未确知测度
1)  unascertained measure
未确知测度
1.
Preliminary evaluation on ship safety based on unascertained measure;
基于未确知测度的船舶安全状况预评价
2.
Colliery ventilation safety evaluation on the basis of the unascertained measure;
基于未确知测度理论的矿井通风安全评价
3.
Application of unascertained measure model in mining enterprises economic benefit evaluation;
煤炭企业经济效益评价的未确知测度模型
2)  unascertained measurement
未确知测度
1.
On the basis of the unascertained measurement space, this paper sets up the model of unascertained measurement evaluation and uses it to evaluate a city's environmental quality.
未确知测度空间基础上,建立未确知测度评价模型并用于城市环境质量评价; 与模糊综合评判、灰色聚类分析、物元分析、BP人工神经网络等评价方法比较,未确知测度评价模型严谨,评价结果合理、精细、分辨率高,更适合于环境质量评价
2.
On the basis of unascertained measurement space, an unascertained measurement model for evaluating sustainable utilization of regional water resources is set up.
针对水资源系统是一个具有未确知性特征的复杂大系统的实际 ,在未确知测度空间的基础上 ,构建了区域水资源可持续利用评价的未确知测度模型 ,并将该模型应用于西安市水资源开发利用程度的评价。
3.
The risk assessment model was obtained,based on the information entropy and unascertained measurement theory.
基于信息熵和未确知测度理论,构建评价模型,并进行定性、定量分析。
3)  the unascertained measure
未确知测度
1.
Comprehensive cssessment method for the credit of construction company based on the unascertained measure;
利用未确知测度评价建筑企业信用等级
2.
In addition, the unascertained measure model is established and quantitative analysis of every safety index is done.
本文根据未确知数学理论,建立了预评价指标体系、置信度识别准则及评分准则,构造了矿井安全预评价未确知测度模型,并对矿井的各个安全指标进行了定量分析。
3.
After analyzing the shortcoming of the safety assessment method of coal mines,the unascertained measure based on the practice of coalmines is proposed in the paper and the new qualitative and quantitative solution method is introduced to research the safety assessment of coal mines and to overcome the shortcomings.
在分析了煤炭行业原有安全综合评价缺陷的基础上 ,论文建立了未确知测度模型对煤矿安全进行综合评价。
4)  unascertained measurement model
未确知测度
5)  uncertainty measure
未确知测度
1.
The analysis of influence degree of building construction quality based on uncertainty measure;
基于未确知测度的建筑工程工期影响度分析
2.
The concept of uncertainty measure and degree of confidence isgiven.
给出了未确知测度、置信度的概念,建立了基于未确知测度的工程建设投标风险,报价成本比,中标概率确定模型。
6)  unascertained measure model
未确知测度模型
1.
Application of unascertained measure model based on entropy weight to evaluation of eutrophication of lakes and reservoirs;
基于熵权的未确知测度模型在湖库富营养化评价中的应用
2.
This paper taking ecosystem health as its theoretic base,according the uncertainty of indicator information,put forward assessing and analyzing the questions of urban ecosystem health by unascertained measure model.
采用生态系统健康理论,根据评价信息的不确定性,提出应用未确知测度模型来评价和辨析城市生态系统健康问题,并结合城市复合生态系统特征,建立包含经济-自然-社会三个亚系统的城市生态系统健康评价指标体系。
3.
Considering the unreasonableness of wastewater quality class divided by single factor,the unascertained measure model was used to assess the effluent quality from a printing and dyeing wastewater treatment plant.
未确知测度模型对评价空间实现了有序分割,提高了分辨率,评价效果可靠,是一种实用模型。
补充资料:知在
知在
知在

知在(张洁最新长篇力著)

作者:张洁 著

出版社:北京出版社

isbn:7530208373

印次:1

纸张:胶版纸 出版日期:2006-3-1

字数:125000

版次:1

内容提要:

这是著名女作家张洁继第二次摘取茅盾文学奖桂冠之后创作的第一部长篇小说。

一个在沙漠风暴中几乎丧命的人,偶然得到半幅古画。一枚枚收藏印章,显示着此画的不凡,又似有难言之隐。作画者何人?另半幅又在哪里?……

小说紧紧围绕古画展开。一个又一个看似毫无关联的偶遇,串联起这幅画卷在人问的颠 沛流离;一代又一代收藏者,相互间有着不清不楚、千丝万缕的联系。谁也不知道这幅古画缘自一段凄美而惨烈的爱情,然而,凡与之有瓜葛者,大多命途多舛。是宿命,还是暗藏玄机?

小说以纯文学笔法描述悬疑情节,于平实中见惊悚,于灵动中诉沧桑,写出了作家“另一面”的独特想象与探究,传达出作家对“知”与“在”的思考,更有几分难以言说的“禅”意,以长篇小说少见的简洁凝练、大捭大阖,把一个诡异离奇的故事写得神秘、空灵、动人心魄,读来酣畅、大气,耐人寻味。

小说有别于张洁以往全部作品,展现了她文学创作中不为人知的“另一面"。我们看到了这位文坛宿将仍在小说之路上孜孜以求的探索,看到了她又一部让人耳目一新的佳作。

作者简介:

张洁,女,1960年毕业于中国人民大学。国家一级作家。北京市作家协会名誉主席。中国作协第六届全委会委员。国际笔会中国分会会员。1992年被选为美国文学艺术院荣誉院士。  1978年始发表文学作品,著有长篇小说《无字》(获第六届国家图书奖、第六届茅盾文学奖)、《沉重的翅膀》(获第二届茅盾文学奖),中篇小说《祖母绿》(获第三届全国优秀中篇小说奖),短篇小说《森林里来的孩子》(获第一届全国优秀短篇小说奖)等,是我国第一个荣获长篇、中篇、短篇小说三项国家大奖的作家,也是全国惟一两度荣获茅盾文学奖的作家。另有短篇小说集《爱,是不能忘记的》、中篇小说集《方舟》、长篇散文《世界上最疼我的那个人去了》以及《张洁文集》(四卷)等。  作品已被译为英、法、德、俄、丹麦、挪威、瑞典、芬兰、荷兰、意大利等多种文字出版。获1989年度意大利马拉帕蒂国际文学奖。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条