说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 准备工作
1)  preparation work
准备工作
1.
Therefore, the author introduced pre-drilling preparation work and 4 kinds of zone sticking methods, which were stratum reflected wave group tracing method, lithology standard horizon and reference horizon correlation method, sedimentary rock cycle correlation method, and well logging curve feature correlation method, summarized and prov.
对取心前的准备工作以及4种卡层方法(地层反射波组追踪法,岩性标准层、标志层对比法,沉积旋回对比法,测井曲线特征对比法)进行了详细介绍。
2.
Technical preparation work is very important, and it is a precondition of ensuring project progress and quality, decreasing project cost and offering good field HSE management.
安装工程开工前的技术准备工作非常重要,它是保证工程进度、工程质量、降低工程成本、搞好现场HSE管理的先决条件。
2)  preparatory work
准备工作
1.
To carried on the soda-wash tower in the open-air scene which three sections of groups welded to carry on the before the load some preparatory work design and the computation,and has carried on the induction summary to the load process operation,the guarantee load security techinical measure was proposed.
对在露天现场进行三段组焊的碱洗塔进行了装车前一些准备工作的设计和计算,并对装车过程的操作进行了归纳总结,提出了保证装车安全的技术措施。
2.
This paper introduces the preparatory work before the installation of CIS combined electrical apparatus, and expounds the procedures of the installation of CIS combined electrical apparatus.
介绍了GIS组合电器设备安装前的准备工作,阐述了GIS组合电器设备的安装程序。
3)  preparations [英][,prepə'reiʃən]  [美][,prɛpə'reʃən]
准备工作
1.
After analyzing graduates viewpoints, psychology and competences for employment, this paper gives out some guidelines for college graduates to make preparations for employment so as to strengthen their competitiveness in the labor market.
本文针对目前大学毕业生就业形势日趋严峻,通过毕业生就业观念、择业心理,能力培养等方面分析,指导毕业生做好就业前的准备工作,提高毕业生就业竞争力。
4)  Job readiness
工作准备
5)  well preparation
井准备工作
6)  preparative work before construction
施工前准备工作
补充资料:承包人要求发包人作好施工前的准备工作的权利
承包人要求发包人作好施工前的准备工作的权利:施工前的准备工作是整个工程建设过程的重要组成部分,是保证工程建设按期开工和保证工程质量的一个重要环节。发包人应当按照合同的约定作好施工前的准备工作,包括:于施工前办妥正式工程和临时设施范围内的土地租用、征用申请施工许可证,爆破及临时铁道专用线接岔许可证;确定建筑物(或构筑物)、道路、线路、上下水道的定位标桩、水准点和坐标控制点;开工前,接通施工现场水源,电源和运输道路,并按约定清除施工现场的障碍物;组织有关单位对施工图等技术资料进行审定,并按约定的时间和份数提供给承包人。合同中约定由发包人提供材料和设备的,发包人应按照约定的范围和时间向承包人提供材料和设备。根据《合同法》第283条规定,发包人未按照约定时间和要求提供原材料、设备、场地、资金、技术资料的,承包人可以顺延工程日期。并有权要求赔偿停工、窝工等损失。----------出自《合同法》第283条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条