1)  project opencast & underground mining
露天-井工联合开采
2)  combined model of open-pit and underground mining
井工-露天联采
3)  turning open into pit mining
露天转井工开采
4)  combined mining of underground and surface
露井联合开采
5)  openpit-underground mining
露天-地下联合开采
6)  Surface and underground combined mining
露天地下联合开采
1.
In the Surface and underground combined mining scheme of the primarg design in Huidong Lead Zinc Mine,it was decided to start underground mining at 1980m tevel under the open pit bottom by downward slice and drift mining with cemented filling and gradually form a 36m thick separation pillar,howerer this scheme was not suited to the actual situation of the mine already.
会东铅锌矿初步设计的露天地下联合开采方案,确定地下采矿从露天坑底1980m 水平开始,用下向分层进路胶结充填法采矿,并逐步形成厚36m 的隔离柱,但该方案已不适应该矿的实际情况。