说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 钢管混凝土拱桥
1)  CFST arch bridge
钢管混凝土拱桥
1.
Analysis on ultimate load-bearing capacity of largespan half-through CFST arch bridge;
大跨中承式钢管混凝土拱桥极限承载能力
2.
Seismic behavior analysis of a 5-span continuous half-through CFST arch bridge;
5跨连续中承式钢管混凝土拱桥抗震性能分析
3.
Considering the Material Non-linearity Analysis Theory of the Relative Glide of CFST Arch Bridge;
考虑材料相对滑移的钢管混凝土拱桥非线性分析理论
2)  concrete-filled steel tube arch bridge
钢管混凝土拱桥
1.
Influence of the rise-span ratio on the mechanical behavior of the concrete-filled steel tube arch bridge;
矢跨比对钢管混凝土拱桥受力性能的影响
2.
Analysis of load capacity of new-style joints between cable and concrete-filled steel tube arch bridge;
吊索与钢管混凝土拱桥新型节点承载性能分析
3.
Calculation method for optimizing the installation process of concrete-filled steel tube arch bridge;
钢管混凝土拱桥吊装过程的最优化计算分析
3)  concrete-filled steel tubular arch bridge
钢管混凝土拱桥
1.
Applications of self-compacting concrete in concrete-filled steel tubular arch bridges;
自密实混凝土在钢管混凝土拱桥中的应用
2.
Nonlinear Analysis for Stability of Concrete-filled Steel Tubular Arch Bridge
钢管混凝土拱桥空间稳定非线性分析
3.
This article illustrated construction techniques of arch rib assembling of concrete-filled steel tubular arch bridge with great span.
通过对大跨度钢管混凝土拱桥拱肋分段扣挂悬拼施工的介绍,利用吊装扣挂体系的几何关系,推导出交界墩墩顶水平位移与拱肋标高改变值之间的关系表达式。
4)  concrete filled steel tubular arch bridge
钢管混凝土拱桥
1.
Analysis on rib rigidity of concrete filled steel tubular arch bridge;
钢管混凝土拱桥拱肋刚度设计取值分析
2.
Application of cable erection and strayed knotting method to construction of concrete filled steel tubular arch bridge;
缆索吊装斜拉扣挂法在钢管混凝土拱桥施工中的应用
3.
The development of concrete filled steel tubular arch bridge and concrete filled steel tubular compound arch bridge;
钢管混凝土拱桥与钢管混凝土复合拱桥的发展
5)  concrete filled steel tube arch bridge
钢管混凝土拱桥
1.
Load capacity analysis of concrete filled steel tube arch bridge with the composite beam element;
应用复合梁单元实现钢管混凝土拱桥的极限承载力分析
2.
The research on the self-vibration characteristics of a concrete filled steel tube arch bridge
钢管混凝土拱桥自振特性研究
3.
Lateral brace arrangement for large-span half-through concrete filled steel tube arch bridge
大跨中承式钢管混凝土拱桥的横撑布置
6)  steel pipe concrete arch bridge
钢管混凝土拱桥
1.
The article introduces the basic theory and combined method of response spectrum and uses the FEM program(MIDAS CIVIL) to analyze and study the seismic performance of response spectrum for the steel pipe concrete arch bridge at No.
该文通过介绍反应谱基本理论和组合方法,应用通用有限元程序(MIDAS CIVIL),对设计中的大连港鲇鱼湾港区22号原油泊位钢管混凝土拱桥进行了反应谱抗震性能分析与研究,其主要结论为大桥的设计抗震能力提供了结论性意见。
2.
Taking an existing steel pipe concrete arch bridge as an example, based on the analysis of parameter sensitivity and adopting the design parameters as the modifying parameter, the article builds the objective function uniting the frequency with deflection.
该文以一座既有的钢管混凝土拱桥为例,在参数灵敏度分析的基础上,以结构设计参数为修改参数,构造联合频率和挠度的目标函数,借助ANSYS的优化设计功能对该桥的有限元模型进行修正。
补充资料:钢管混凝土结构施工


钢管混凝土结构施工
construction of concrete depositing steel pipe structure

gangguan hunn旧gtuJ一egou shjgong钢管混凝土结构施工(eonstruetion of con-erete depositing steel pipe strueture)钢管混凝土结构是利用钢管与灌入管中的混凝土共同作用的原理设计的一种复合结构。它兼有钢管结构和钢筋混凝土结构的优点,承载力较高,塑性和韧性较好,可节省材料,缩短工期,目前已在工业和民用建筑工程柱系统中应用。钢管混凝土结构柱施工程序如图。六饰(定施讨月管柱八开设扫卜心月管柱八卜部结矛匆尧灌僧汾、处理陇乃 回流装里 钢管混凝土柱施工程序网络图 钢梵段节的制作管材优先采用螺旋焊接钢管,也可用滚床自行卷管,卷管方向应与金属压延方向一致。根据板厚开始板端坡口,坡口端应与管轴垂直,尽可能采用自动焊接。管肢和各种腹杆焊成后都需进行构件调直。过长的管肢无法进行运输时,应在制作厂进行预组装,经检查合格后再拆开分段运输。 部件组合拼装制成的钢管段节,经检验合格后严格按照规定的工艺要求程序在专用胎具上进行拼装组合,并注意下列事项:(1)管肢对接宜采用分段反向焊接工艺.严格保持焊后管肢的平直。焊接前对小口径钢管应采用点焊定位;对大口径钢管可用附加筋在管外作对口联焊。(2)重要受力管肢,应在管内接缝处加设附加垫圈,并与管内壁保持0.smm的膨胀间隙,以确保焊缝根部质量。(3)主肢钢管与附属焊件的间隙应按饭金展开图进行放样和切割。当节点处的焊接道数较多时,应选择合理的焊接顺序,以减少焊接内应力与变形。(4)钢管构件经检查合格后,应按设计要求进行防腐处理。 结构件安装为了加快安装进度和减轻吊装重量,宜先将空管构件按承重骨架方式进行安装,然后再向管内填灌混凝土。事先应对钢管结构进行强度和稳定性验算。对于多层框架结构可采取分层施工、构件分层安装和分层灌筑混凝土的方法。为了减少柱肢的安装接头,尽可能采用长柱吊装法,即一次吊装的柱高范围可以有2~5层梁板,这样可构成空间框架,为各层主次梁安装及楼板施工提供工作面,以便于进行主体交叉作业。长柱擂入杯口后应立即校正、加固,填筑混凝土固定柱脚,并用缆绳加以固定,然后吊装机械方可脱钩,在杯口二次灌浆后拆除缆绳。第一层钢管柱和主、次梁内混凝土填筑完毕后,结构已有稳固的基层。第二节柱肢的安装。可依靠塔吊式起重机对中校直,完成第一道焊缝后脱钩,然后进行补焊。 管内混凝土填筑空钢管安装成竖向构件后,混凝土采用竖向灌筑补充,由于抛落高度大,混凝土凭其自重无需振捣即能冲压密实。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条