说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 多层胶结结构
1)  multi-layered bonded structure
多层胶结结构
1.
Presents a wavelet-based approach for extracting features from ultrasonic non-destructive evaluation data of a test multi-layered bonded structure specimen.
针对金属-非金属多层胶结结构试件中的超声检测回波信号,提出了一种基于小波变换提取特征参数的方法,提取出来的特征用来评估试件的粘接特性。
2)  multilayered structure
多层结构
1.
Love wave propagation in magneto-electro-elastic multilayered structures;
Love波在电磁弹性多层结构中的频散特性
2.
The ultrastructure of the blepharoplast and the multilayered structure (MLS) in the fern Osmunda cinnamomea var.
asiatica Fernald)精子发育过程中的生毛体和多层结构的超微结构进行了研究。
3.
The reflection and transmission of elastic wave in a multilayered structure composed of elastic base covered with magneto-electro-elastic materials were fully investigated.
研究了弹性基底上覆盖电磁弹性材料组成的多层结构中弹性波的反射与透射系数问题。
3)  multilayer structure
多层结构
1.
The paper puts forward the function gradient model of coolking woven fabric and designs the corresponding multilayer structure.
文章提出了Coolking机织吸湿快干面料功能梯度模型,设计相应的机织多层结构。
2.
Chinese sedimentary basins can be grouped into three types: 1 ) simple halfgraben-like basin, 2)dual-layer superposed basin of half graben-like basin and de pression, 3) multilayer structure basin having platform, half graben-like basin anddepression which are superposed vertically.
中国沉积盆地可分为单层结构箕状断陷型,双层结构断(陷)拗(陷)型,多层结构(地)台、断(陷)、拗(陷)型。
3.
The results indicate that multilayer structure d.
采用普通陶瓷工艺,制备了Co2Z(Ba3Co2Fe24O41)六方铁氧体及Ba2+被Sr2+部分取代的Z型六方铁氧体[Ba3(1-x)Sr3xCo2Fe24O41],并将烧结好的铁氧体粉料压制成多层结构样品。
4)  multi-layer structure
多层结构
1.
Study of relay protection device setting coordination software based on multi-layer structure and component technology;
基于多层结构和组件技术的保护装置整定计算系统研究
2.
Taking the lightning protection information system as the example,the paper introduces the technical method for designing a distributed multi-layer structure of lightning management information system with Delphi MIDAS.
以防雷检测信息系统为例,介绍了用Delphi的MIDAS设计分布式多层结构的防雷管理信息系统的技术方法。
3.
A kind of multi-layer structure blue organic light-emitting diode(OLED) has been developed with TPBi as emitting host material by using vacuum deposition.
采用真空热蒸镀技术,以TPBi为蓝光主体材料制备了一类多层结构的蓝色有机发光二极管(OLED),其结构为:ITO/CuPc(30 nm)/NPB(40 nm)/TPBi(30 nm)∶GDI691(x%)/Alq3(20 nm)/LiF(1 nm)/Al(50 nm),其中x%为发光层掺杂浓度,实验中分别取1%,2%,3%和4%。
5)  multi-tier architecture
多层结构
1.
Multi-tier Architecture Database and Application Instance;
分布式多层结构的设计与实现
2.
Studying of Application System and Developing Method Based on Distributed Multi-Tier Architecture in CORBA;
基于CORBA的分布式多层结构应用系统及开发方法的研究
3.
The realization of a distributed tri-tier or multi-tier architecture based on C/S(client/server) and B/S(browser/ server) mode for geotechnical engineering investigation system is described in this paper.
设计具有3层或多层结构的客户端服务器模型,构建高效率、坚固安全、具有容错能力和负载平衡能力的网络分布式数据处理和采集平台。
6)  multi-layer
多层结构
1.
The construction of the multi-layer book website based on Struts;
基于Struts框架的多层结构图书网站的构建
2.
The article base on the LIMS(Literature Information ManagementSystem)system s research and development, Introducing the CORBA------includethe base conception in CORBA, model, architecture and feature; The article describe the Multi-layer architecture s feature and analyse the Middle-ware technology s exert in the .
本文以LIMS(文献信息管理系统)系统的研究与开发为背景,主要介绍了CORBA规范——包括CORBA的概念、模型、体系结构、特性;描述了多层体系结构及其特点,详细分析了中间件技术在构建多层结构的应用系统中的特点及工作原理;以LIMS系统为例,描述了分布式数据库系统的两种事务处理的并发控制策略,并给出了一个建立对象模型的实例。
3.
The Research and Application on Distribute Information System with Multi-layer Based on Web Services;
Web Services和多层结构理论的出现,给系统结构设计带来了新的技术,适应了这些变化的需要。
补充资料:多层厂房预制钢筋混凝土框架结构安装


多层厂房预制钢筋混凝土框架结构安装
installation of precast reinforced concrete frame structure for multilayer workshop building

定.11 ~.。」:柱1一可下门- 杯形井礴11铆椒,甲丫一目一一丫 位板沙父父护科月黔今了牛’J一一确r一一土- 二黑交哪嗯浮i钊粼减图“连接板埋设件连接法 图1柱子固定示意图柱子四面的连接板和埋设件,然后进行连接板外表面 的刷油和涂装。 由于混凝土的抗弯性能所限,混凝土柱不能过长。梁和板的安装在第一节柱安装完成后,及时将对较高的多层框架柱,一般都设计成多段,在预制厂分预制梁、板安装好,以尽快形成整体框架,保持结构的节制作,运至现场后,由安装者在高空对接成整根柱。稳定。梁与柱的连接多采用柱肩梁承接式,通过梁端头这种多节柱安装的关键在于柱与柱之间对接接口的施上下两面的埋设件与柱的埋设件焊接、固定(图4)。梁工,常用的接口型式有湿式连接(图2)和连接板埋设固定后,将预应力钢筋混凝土板座落在梁上,通过将大件连接(图3)两种。(1)湿式连接法。起吊前先实地板两端下边的埋设件与梁上面的埋设件焊接在一起,量测预留钢筋接头的尺寸,将接头调直,开好坡口;将将板固定起来(图5),使框架形成一个空间刚体。如接头处的混凝土面打毛处理,在柱头上事先系3一4根此逐层依次施工,直至完成多层厂房框架结构的全部缆绳,用于调整柱子就位后的垂直度。起吊后将上下柱安装工作的钢筋接头对准,并用两台经纬仪同时测量柱子相邻丁粉可-两面的垂直度,用缆绳进行校正。垂直度合格后进行对!」下称焊接,先焊接头支承面的钢板埋设件,再焊柱子四角!华卜一,一一洲二二的钢筋和全部对接钢筋,然后复核上下柱中心的垂直1七口,杏一一.州.去盛,度,若无偏差立即支模灌浆。(2)连接板埋设件连接法。IJ}}将柱子起吊后与下柱对准就位,并用两台经纬仪同时!//~测童校正相邻两面的中心线垂直度,合格后进行焊接。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条