说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 施工流程
1)  construction process
施工流程
1.
The construction process of prestressed culvert in invert siphon;
倒虹吸管涵预应力施工流程
2.
On construction process and design elements of the second phase of Yuelong river engineering;
谈跃龙涌覆涌二期工程的施工流程与设计要点
3.
This paper describes the improvements of construction process and key working .
文章介绍了本次动火连头施工流程、关键工序的改进以及应用QC管理进行风险识别、风险消减的具体做法,为今后类似大口径管道动火连头施工积累了宝贵的经验。
2)  construction flow
施工流程
1.
General introduction of construction flow of vacuum preloading method;
真空预压法施工流程概述
2.
The principle, advantage and disadvantage, construction flow and application condition of constructing metro station are mainly expatiated.
重点阐述了修建地铁车站各施工方法的原理、施工流程、优缺点和适用的车站形式 ,为我国各大城市在设计地铁车站时选择合理的施工方案提供直接参
3.
This paper introduces the principle, construction flow and engineering effect of soil-anchor nail technology in combination with the engineering practice.
结合工程实践 ,论述土钉技术的原理、施工流程及工程效
3)  construction procedure
施工流程
1.
The analysis and introduction about mechanics characteristic,design key point,calculation method and construction procedure can provide experience for similar project.
有关该桥型的受力特性、设计要点、计算方法和施工流程的详细分析与介绍,可为同类工程提供借鉴。
2.
It is intraduced that sprayed concret is in use of slope protection,analysing constructiontechnology,construction procedure,construction method,and the effecton afeter construcion.
介绍了喷射混凝土在边坡治理中的应用,对边坡治理方案的选择、施工工艺、施工流程、施工方法和最后效果方面进行了比较详细的介绍、分析。
3.
The paper makes a primary discussion on the require-ments for construction procedures of generic cabling engineering in" Handbook of Generic Cabling System Application", which gives a reference for the persons related.
本文摘编了"综合布线系统应用手册"对综合布线工程的施工流程的要求,进行初步探讨,供相关人员参考。
4)  construction procedure scheme
施工过程流程图
5)  construction technology process
施工工艺流程
6)  construction process flow
施工工序流程
1.
Based on the proposed shield tunneling section of Caonuan Park station-Xiaobei Station of Guangzhou Metro Line 5, this paper introduces the construction process flow and geology forecast measure which is commonly adopted as the shield machine driven in the karst section, and discusses the pretreatment methods and corresponding measures in such case.
本文以拟建的广州地铁5号线(草暖公园站-小北站)盾构区间工程介绍盾构穿越岩溶段时的施工工序流程和常用的超前地质预报手段,并探讨穿越岩溶的施工预处理技术, 以及盾构在穿越溶洞段时的相应措施。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条