说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 污水厂排水
1)  effluent from WWTP
污水厂排水
2)  plant effuent
工厂污水,工厂排水
3)  washing-out
排污;污水
4)  sewage drainage
污水排水
1.
Taking outdoor water supply and drainage design works in comprehensive design of municipal pipeline of C,F zone in Wenhua Yuan district as example,from outdoor hydrant fire system,rainwater drainage system,sewage drainage system and other aspects practical design is introduced,which provide good references for similar works.
结合太原市文华苑C区,F区市政管线综合室外给排水设计工程,从室外消火栓灭火系统,室外雨水排水系统,室外污水排水系统等方面,就各个系统的设计内容及特点作了介绍,为类似工程提供了参考。
5)  washouts,washups
污水,排水
6)  wastewater treatment plant
污水厂
1.
In view of the low influent water quantity and low organic matter concentration,A2/O process in a wastewater treatment plant was started up and operated by activated sludge inoculation training methods.
某A2/O工艺污水厂在进水水量不足,有机物浓度低,采用活性污泥接种培养方法启动运行,通过采取投加营养源,减小曝气量和间隔进水等措施,系统成功启动,考察了在水量不足,有机物浓度低时,系统培养过程中MLSS、MLVSS、COD、TP、NH3-N等参数的变化趋势。
2.
Method of SRT was used to minimize the excess activated sludge production of wastewater treatment plant.
为了解决污水厂生化系统剩余污泥产量过多的问题,采用延长污泥龄(SRT)的方法,对剩余污泥减量化的影响进行了研究。
3.
Because the wastewater treatment plant (WWTP) in cold area is difficult to start up with long time to be taken, the bio-augmentation technology with simultaneous addition of activated liquid strain, biological bacterial agent,and activated sludge into AO basin was firstly adopted in the start-up of Harbin Taiping WWTP.
针对寒冷地区污水厂启动困难、时间长的难题,在哈尔滨太平污水厂启动过程中,首次采用活化菌液、生物菌剂与活性污泥同时投加的生物强化技术,在平均气温为10℃、生化池进水温度为13℃的低温条件下,采用先异步后同步的复合培菌方法,成功进行了AO池活性污泥的培养驯化。
补充资料:兰州炼油厂的污水处理厂


兰州炼油厂的污水处理厂


兰州炼油厂的污水处理厂
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条