说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 输油管道焊接
1)  Oil-pipeline welding
输油管道焊接
2)  pipeline welding
管道焊接
1.
Key point in technical management of pipeline welding construction;
管道焊接施工技术管理要点
3)  welded pipes
焊接管道
1.
Study on the leak rate of fluid in welded pipes in leak-before-break analysis;
焊接管道LBB分析中泄漏速率的研究
4)  pipe welding
管道焊接
1.
Image processing and features extraction of molten pool for pipe welding;
管道焊接熔池图像处理与特征提取
2.
Downward welding is a efficient method in pipe welding.
就管道焊接中的高效焊工艺方法———管道下向焊的工艺特点及对弧焊机的特殊要求进行了剖析,介绍了适用该工艺方法的几种品牌焊机,对工程施工单位及焊机制造厂商具有一定参考价值。
5)  acid gas pipeline weld
酸性气体输送管道焊接
6)  oil pipeline
输油管道
1.
Numerical modeling of oil pipeline bending caused by migrating pingos in the permafrost on the northern Qinghai-Tibet Plateau;
青藏高原移动冰丘引起输油管道拱曲的数值模拟
2.
A new method of synchronized design for oil pipeline and thermal insulation layer;
一种新的输油管道及其保温层设计方法
3.
Design and implementation of the oil pipelines leak detection system based on wireless local area network;
采用无线局域网的输油管道泄漏检测系统的设计与实现
补充资料:"友谊"输油管道
      世界最大的原油输送管道之一。起自苏联鞑靼自治共和国的阿尔梅季耶夫斯克,经俄罗斯联邦共和国的欧洲部分,到达莫济里附近分为北部、南部两条支线管道。北部支线经布列斯特进入波兰,并延伸到民主德国;南部支线经乌日哥罗德进入捷克斯洛伐克和匈牙利。管道由直径为426、529、720、820、1020、1220毫米的管段组成,全长5327公里(其中苏联境内3688公里)。年输原油约1亿吨,是苏联向欧洲出口原油的主要通道。
  
  "友谊"输油管道是苏联、波兰、捷克斯洛伐克、匈牙利和民主德国共同兴建的。工程于1960年初开始,分两期进行。第一期工程于1964年完成,建成由阿尔梅季耶夫斯克经古比雪夫、乌涅查到莫济里的主线及北部、南部支线。修建中,管道逐段建成,逐段投产。第二期工程于1969年开工,采用逐段铺设副管、增建泵站,然后与一期工程的主管相连的方法,铺设了长为4412公里的副线。管道修建工程规模巨大,沿线穿过第聂伯河、德涅斯特河、维斯瓦河、奥得河、多瑙河等通航大河68条,穿越铁路122处,通过平斯克沼泽区和海拔1100米的喀尔巴阡山脉。第一期工程管道用钢量达73万吨。
  
  "友谊"输油管道采用密闭输油流程。沿线泵站安装有长输管道专用离心式油泵,采用串联泵流程,泵站出口压力为50~64千克力/厘米2。泵站间距为80~110公里。对泵站的控制采用程序控制方法,其程序控制项目包括改变流程时阀门的开启和关闭、泵的启停、泵压和输油温度、轴承温度的监测和电机的断电保护等。管道采用明线通信和无线电通信,利用沿线五国电话网进行生产调度。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条