说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 造价管理
1)  cost management
造价管理
1.
On the cost management of government invested programs;
政府投资项目造价管理工作探讨
2.
Financial investment judge monitors the cost management of government invested programs in the whole process;
财政投资评审全程监控政府投资项目造价管理
3.
Construction cost management of construction enterprise after implement of engineering quantity list pricing;
谈工程量清单计价实施后施工企业的造价管理
2)  cost control
造价管理
1.
Measures to strengthen the whole procedure cost control of construction project;
谈建设工程的全过程造价管理
2.
According to the importance of information system in the cost control on road,the necessity and actuality are analyzed.
为加快公路工程造价管理的信息化发展,从造价信息系统在公路工程造价管理中的作用出发,分析建立公路工程造价管理信息系统的重要性和现状。
3.
According to the importance of cost information in the cost control on road,this paper analyses the necessity and actuality,moreover,the method of establishing informational system by way of requirement analysis to accelerate the informational development of cost control,even points out the trend of this system is virtual project.
为加快公路工程造价管理的信息化发展,从造价信息在公路工程造价管理中的作用出发,分析了建立公路工程造价管理信息系统的重要性和现状,并根据公路工程的特点,运用需求分析的方法对如何建立进行了探讨,同时提出“虚拟工程”将是该管理系统未来发展趋势的观点。
3)  construction cost management
造价管理
1.
To obtain the biggest benefit by the fewest funds investment is the final goal of basic project management,which also reflect the vital significance of the project construction cost management and remarkable prominent status of hydraulic engineering construction cost management in the hydraulic engineering construction.
水利工程造价管理是项目管理中一项非常重要的内容,以较少的资金投入,获得最大的经济效益,既是基本建设项目管理的最终目的,又体现了工程造价管理的重要意义和水利工程造价管理在水利工程建设中显著而突出的地位。
2.
To set up construction cost management system, much attention should be paid to basic work, and the quota should be improved, cost data should be collected, clarified, and analyzed from proviously completed projects and the projects which are being built.
建立工程造价管理技术系统应立足于基础工作,完善工程定额,收集整理已建工程和在建工程的造价资料,建立工程价格信息网,研究工程造价管理理论
3.
Firstly, this article introduces the present situation and the existence questions of the construction cost management in architecture industry in our country, then analyzes the superiority of the entire life cycle construction cost management, elaborates how to engineer it effectively in different project period and also proposes some implements.
本文介绍了我国建筑业工程造价管理的现状及其存在的问题,分析了全生命周期造价管理的优越性,阐述了工程项目各阶段该如何进行有效的工程项目全生命周期造价管理,并提出了我国实施全生命周期造价管理的几点建议,最后通过实例分析了实行工程项目全生命周期造价管理的重要性。
4)  management of construction cost
造价管理
1.
Coordination strategy for offering in the bid and management of construction cost;
投标报价与造价管理的配合策略
2.
This paper mainly discussed the problems that existing in management of construction cost in implementation stage of construct engineering item as well as the cause of formation.
文章就我国建筑工程项目实施阶段造价管理过程中存在的问题及其成因进行剖析,并在结合国情的基础上,提出了项目实施阶段造价控制与管理的相应策略,以期对我国的工程项目建设与管理有所裨益。
5)  project cost management
造价管理
1.
This paper reviews the entire process of cost control of construction projects,and then a detailed explanation of the current construction project cost management issues is given.
本文回顾了对建设项目全过程造价控制的研究情况,阐述了我国当前建设项目造价管理存在的问题,并且对工程项目造价基本理论进行了研究,最后提出了工程项目进行全过程造价控制,并提出了各阶段应当进行的工作。
6)  total process cost management
全过程造价管理
1.
Two kinds of valuation mode on construction cost and the meanings of total process cost management(TPCM) are described in this article.
介绍了我国工程造价计价的2种模式和全过程造价管理的含义,重点阐述了工程量清单计价模式下的建设项目全过程造价管理,对工程量清单计价中存在的问题也进行了说明。
补充资料:发电工程造价


发电工程造价
power project construction cost

fadion gongeheng zoojlo发电工程造价(power projeet constructioncost)指发电工程从前期工作开始,到投产发电的全部工程费用。它因内容不同可分为发电工程静态投资、发电工程动态投资。 发电工程静态投资由建筑工程费、设备购!费、安装工程费、其他费用、基本预备费和材料价差组成,其反映的是某一价格水平年的静态造价水平。1998年价格水平中国内发电工程单位造价水平为:2x300MW国产引进型机组新建4422元/kW,扩建3759元/kw,4台机组时4090元/kw;2X600MW国产引进型嫌煤机组新建3675元/kW,扩建3381元/kw,4台机组时3528元/kw;2 x 300 MW等级进口嫩煤机组新建5010元/kw,扩建4460元/kw,4台机组时4735元/kW;2x600MW等级进口燃煤机组新建4640元/kw,扩建4450元/kW,4台机组时4545元/kW。 发电工程动态投资由发电工程静态投资、价差预备费和建设期贷款利息组成,其中价差预备费是指工程从编制年至竣工年期间建筑工程费、设备购置费、安装工程费、其他费用上涨而预备的费用;建设期贷款利息是指工程项目的各类融资在建设期发生的利息。按电力工程单机竣工结算办法,第一台机组及公用系统所发生利息计算到第一台机组投产前一季度,第二台机组投资所发生的利息计算到第二台机组投产,以下类推。1”8年审批的发电工程初步设计概算动态投资情况如下:2台30万新建国产机组为4997元/kW,2台60万扩建国产机组为4481元/kW,2台35万新建进口机组为5588元/kW,2台“万新建进口机组为6388元/kW。由于价差预备费、建设期贷款利息与国民经济发展情况、物价上涨情况、利息变化情况有关,而这些因素往往具有不可预见性,因此从1995年起对工程概算执行“静态控制,动态管理”的政策,即控制静态投资在批准的额度以内,动态投资则可根据实际情况进行调整。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条