说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 采装设备
1)  Excavate Equipment
采装设备
2)  longwall face equipment assembling
综采工作面设备安装
3)  Equipment or furnishings.
装备,设备
4)  oil recovery equipment
采油装备
1.
On the basis of many achievements made from the application of ultrasonic oil recovery technology in our country,the whole set of high power ultrasonic oil recovery equipment is developed successfully.
在我国超声波采油技术和应用取得许多研究成果的基础上,研制成功大功率超声波采油成套装备,包括大功率超声波电源、低损耗超声波增油专用电缆、超声波作业专用马笼头和井下高性能超声波换能器等,整套采油装备输出功率、传输效率和可靠性大大提高。
5)  oil drilling-production equipment
钻采装备
1.
This paper utilizes the illustrations of oil drilling-production equipments development laws to conclude ten items of thinking of blazing new ideas and crative methods.
文章以石油钻采装备的发展规律为例 ,总结出 10条创新思维及创新技法 ;在“举一反三”条目中 ,列出了石油钻机的型谱 ,在“未有穷尽”条目中 ,列举出 3个方面的创新课题等待去攻克。
6)  fully-mechanized coal winning equipment
综采装备
补充资料:前端装载机采装


前端装载机采装
front-end-loader loading

臀书 前端装载机采装作业 (李公照)qondLJan zhaan乎oljl eojzh旧ng前端装载机采装(front一end一loader loading) 在露天矿山应用前端装载机进行采装是20世纪60年代发展起来的一种方式,适用于破碎良好的矿岩和表土砂砾等条件。它多与汽车配合完成装、运过程;在运距短(小于50om)的情况下,也常独立完成装、运、卸过程。前端装载机采装工作面的形式有端工作面和纵向工作面两种。装车时可使前端装载机倒行转移300~90“,再前行至车旁卸料入车(图中a、b、。),此移动距离一般为8~12m,也可使前端装载机梭式往返移动5~10m,卸料人车(图中d);采用侧卸式前端装载机时,在其铲取物料后倒行2~3m至车旁卸料人车(图中尸)。前端装载机采装循环时间一般为50~705。适用的台阶高度一般为5~6m,当使用斗容sm‘以上的大型前端装载机时可达sm,以至10~15m。过高的台阶或爆堆采取分段采装。最大前端装载机的标准斗容达16,8m3.可与载重200t左右的汽车配合作业,其装载高度达6. 7m。 前端装载机采装能力计算式为 _3600VK。 Qh一二二舟吞二二二 %n tK.式中Qh为小时采装能力,m“/h;v为铲斗容积.m3;KH为铲斗装满系数;K。为物料松散系数;t为采装作业循环时间,“。 尽管前端装载机比挖掘机的重量轻、价格低、行走快和机动灵活,但服务年限短,铲取力小.维修量大。这种采装方式多用于中、小型露天矿,在大型露天矿很少应用。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条