说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 消防验收
1)  fire control acceptance
消防验收
1.
A brief talk on the application in fire control acceptance of “project hydromechanics”;
浅谈“工程流体力学”在消防验收中的应用
2)  fire engineering acceptance
消防工程验收
3)  building's fire project
建筑工程消防验收
4)  fire protection experiment
消防实验
5)  fire control laboratory
消防实验室
1.
The fire control laboratory was introduced briefly,the design of fire automatic alarm system and fire linkage control system were expounded.
介绍了消防实验室的概况,详细阐述了火灾自动报警系统、消防联动控制系统的设计。
6)  fire transceiver
消防主机收发器
1.
This paper firstly presents the attribute and characteristic of MSComm control block and particularly expounds the communication principle between fire machine and fire transceiver and how to realize the communication of fire simulator and fire transceiver by using the MSComm Control in Visual C++ 6.
0中M SComm(M icrosoft Comm un ications Contro l)控件的属性和特点,然后详细阐述了消防主机与消防主机收发器之间通信的工作原理,以及如何利用该控件实现消防主机模拟器与消防主机收发器之间的通信。
补充资料:承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利
承包人要求发包人组织工程验收,包括隐蔽工程的验收和工程竣工的验收的权利:根据我国《合同法》的第278条规定隐蔽工程在隐蔽以前,承包人应当通知发包人检查。发包人没有及时检查的,承包人可以顺延工程日期,并有权要求赔偿停工、窝工等损失。根据《合同法》第279条中的规定建设工程竣工后,发包人应当根据施工图纸及说明书、国家颁发的施工验收规范和质量检验标准及时进行验收,因此在工程完成时组织竣工验收,也是发包人的主要义务。建设工程竣工验收合格后,方可交付使用,未经验收或者验收不合格的,不得交付使用,发包人对未经验收的工程,提前使用或者擅自动用的,对发现的质量问题由发包人自行承担责任。-------------《民法》第一版,第514页。魏振瀛;《合同法》的第278条
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条