1)  hoisting scheme
吊装方案
1.
With the comprehensive analysis and comparison on economics,technique,cost and time period of hoisting schemes,the double masts method is adopted.
反应再生区的沉降器和再生器是本装置施工的重点和难点,制订合理的吊装方案是该工程的关键。
2.
This paper gives a description of the selection and optimization of the hoisting scheme of prefabricated industrial plant building with the value engineering theory, which has created good economic and social benefits for enterprises.
阐述了运用价值工程理论进行装配式工业厂房吊装方案的优选及优化,为企业创造了良好的经济效益和社会效益。
2)  lifting plan
吊装方案
1.
D-type pier lifting plan choice under low basement;
低路基条件下D型梁吊装方案选择
3)  Hoisting plan
吊装加固方案
4)  design of structures installtion
吊装方案设计
5)  hanger program
吊架方案
1.
The high pier column scaffold construction coping hanger program;
高墩柱脚手架施工盖梁吊架方案
6)  lifting option
起吊方案
补充资料:厂房钢结构组合吊装


厂房钢结构组合吊装
combined hoisting of steel structure for workshop building

  采用组合吊装时,要结合结构型式,根据起重设备能力,保证安全、质量,提高作业效率的原则确定构件组合的范围。常用的组合形式有:(l)多节柱的组合,对H形框架结构也可采用柱与梁组合;(2)吊车梁与辅助析架的组合,将吊车梁、辅助析架利用制动板、水平支撑、垂直支撑进行固定,形成组合体;(3)天窗架的组合,将垂直天窗架与屋面、墙面擦条、天沟和支撑等进行组合;(4)墙面系统的组合,以墙皮柱作骨架,将其与墙面镶条、拉条和钢窗等组合在一起.(5)厂房屋面系统整体组合吊装,将2~3棍屋架,与屋架间上下弦的水平支撑、垂直支撑、屋面镶梁、天沟及天窗等全部构件组合成整体进行吊装。 组合吊装一般选用大型塔式起重机或履带式起重机。吊装前要对起重设备和组合构件进行验算,包括:(1)起重机的起重能力(包括起重量、回转半径、起重高度等)复核;(2)组合件整体稳定和局部稳定验算;(3)吊点处局部变形验算和吊点距离计算;(4)提升用绳索和吊具验算。验算结果全部符合技术要求后,方可进行吊装。 (刘庆华)ehangfang gang」旧gou zuhe dlaozhuang厂房钢结构组合吊装(eombined hoisting ofsteel strueture for workshop building)将部分单体构件预先在地面上组拼成整体后,用起重设备提升到设计位置上的作业。这种方法比单体吊装可大量减少高空作业,节省大型起重设备的台班费用,有利于保证结构节点的焊接质量。但施工准备时间较长,结构组合几何精度控制较复杂,并需选用有较大提升能力的起重设备。
  