说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 复杂应力条件
1)  complex stress condition
复杂应力条件
1.
A comparative study on monotonic and cyclic shear behavior of saturated loose sand under complex stress condition;
复杂应力条件下饱和松砂单调与循环剪切特性的比较研究
2)  complicated condition
复杂条件
1.
Displacement control under deep foundation pits complicated conditions——Design of the foundation pit of Yalong General Headquarters Building;
复杂条件下基坑变形控制——亚龙总部大楼基坑工程设计研究
2.
Study survey on moving objects detection in complicated condition;
复杂条件下的运动目标检测方法研究综述
3.
Base on the complicated condition in locale,had studied transport and set the technology of hydraulic support,introduce how to transport and set,how to prevent slant of hydraulic support,the worker's position and the innovation of technology and so on,in excavate coal locale,summarized a series of effective technology of large-scale excavate coal equipment setting.
根据综放工作面的复杂现状条件,研究了液压支架的运输安装技术,介绍了复杂条件下综放采煤工作面液压支架的运输方法、防倒架歪架技术、人员安全站位和技术创新等,总结一套行之有效的复杂条件下大型综采设备安装的工艺技术。
3)  complex conditions
复杂条件
1.
Stress and stability analysis of high arch dam under complex conditions;
复杂条件下高拱坝应力及坝肩稳定分析
2.
In the meantime, it gives an example for the land use classification based on vector data under complex conditions and probes the remote sensing image classificationwith the vector data.
基于矢量数据的土地利用分类方法进行分类研究,对复杂条件下的基于矢量数据的土地利用分类给出了实例及实现方法,对利用矢量数据进行遥感图像分类进行了深入探讨。
3.
The purpose of this thesis writing is talking about the studies on the controlled blasting demolition on chimneys in complex conditions by way of a practical demolition example of a 70 meters high chimney,on the scheme of controlled blasting demolition,incision of blasting as well as design of the directional windows and choosing blasting parameters.
以三门峡市渑池县化工厂70 m高烟囱定向爆破拆除为例,针对在复杂条件下烟囱控制爆破拆除方案的选择,爆破切口、定向窗的设计,爆破参数的选取进行了研究,可为复杂条件下烟囱控制爆破拆除提供参考。
4)  complex condition
复杂条件
1.
Safety and quick recovering technology at light face under complex conditions;
复杂条件下轻放面安全快速收作技术
2.
Analytic solution of beams on Winkler foundation under complex conditions;
复杂条件下Winkler地基梁的解析解
3.
Design and practice of freezing method applied to connected aisle in tunnel under complex conditions;
复杂条件下隧道联络通道冻结施工设计与实践
5)  complicated conditions
复杂条件
1.
This paper described the geological results and main adopted 3D seismic technological measures in course of the open-air data gathering under the complicated conditions, data processing and explanation, to solve the complicated problems caused by target layers deep buried depth, violently changed inclination, the characteristics that the magmatic rocks corroded seriously in the 7th coal seam.
针对张集煤矿深部区域三维地震勘探区目的层埋藏深、倾角变化剧烈、7煤被岩浆岩严重侵蚀的特点,阐述了复杂条件下三维地震勘探的野外数据采集、资料处理与解释过程中所采用的主要技术措施及取得的地质效果。
6)  most complexed geology
极复杂条件
补充资料:轧辊残余应力(见轧辊应力)


轧辊残余应力(见轧辊应力)
residual stresses in roll

zhagun eanyu yingli轧辊残余应力(residual stresses in roll)见礼辐应力。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条