说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 调酸时间
1)  Acid preparing time
调酸时间
2)  cooking length of time
烹调时间
1.
The meat cooking degree is controlled by cooking length of time and temperature.
肉类烹调程度受烹调时间和温度的控制。
3)  setup time
调整时间
1.
Lot-streaming in three-stage flow shop with setup times separated;
三台机器流水作业中存在不同调整时间的Lot-streaming问题
2.
For the lot-streaming problem in multi-stage flow-shop,the majority of the research in the past used to fix the number of the batches and find only the optimal batch sizes without consideration the setup time:In this paper,however,Setup time for the machines is introduced.
多台机器流水作业的 Lot-streaming问题(简称LS),以往的研究都不考虑调整时间,固定分批数,寻找最优分批大小;本文对机器引入调整时间,研究同时决定最优分批数及分批大小,并给出了相应最优算法。
3.
For the Lot-Streaming problem in a two machines flow shop, the majority of the research presented fixed the number of the sublets, or the two machines have the same setup times.
对二台机器流水作业中的Lot-Streaming问题(简称LS),以往的研究多为固定分批数寻找各批大小,或对二台机器引入相同的调整时间,寻找最优分批数及各批大小。
4)  Time delta modulation
时间△调制
5)  regulating time
调节时间
1.
By analyzing the sensitivity between moment of inertia and rising ratio of rotating speed as well as the sensitivity between moment of inertia and regulating time in the hydraulic transients, the critical points.
通过对水电站过渡过程中机组转动惯量与转速上升率和调节时间的敏感性分析,发现转动惯量存在临界点,并且后者的临界值小于前者,验证了导叶关闭规律优化中尽量用足机组转速上升率的合理性。
2.
Hydraulic turbine governor is one of the important control devices of hydrogenerating set,regulating time after the unit trip with rated load is a main technical index specified on the standards published by China and IEC.
水轮机调速器是水轮发电机组的重要控制设备,甩额定负荷后的调节时间是其主要技术指标之一,我国和国际电工委员会(IEC)有关标准均有严格规定,本文对影响甩额定负荷后水轮机调速器调节时间的因素做一综述,并就如何按IEC标准要求调整调速器参数,开发微机电调甩负荷变参数功能,以达到缩短调节时间的目的进行了探讨。
6)  setup times
调整时间
1.
This paper deals with the order planning of single machine with multi product classes and sequence independent setup times, and proposes a mixed integer programming model to minimize the sum of earliness/tardiness penalties of orders.
针对单机多产品多订单有序独立机器调整时间的订单排产问题 ,建立了以最小化订单的提前和拖期罚值总和为优化目标的混合整数规划模型 ,分析了问题的NP -hard性和最优排序中临近批组的优化特性 ,提出一个基于过滤束搜索的拟多项式时间算法 ,算法复杂性分析和仿真结果验证了算法的有效性 。
2.
In this paper,several parallel machine scheduling problems with setup times are discussed.
本文讨论带有工件调整时间的几种平行机排序问题,分析在不同情况下的计算复杂性。
3.
To efficiently solve multi-objective flow shop scheduling problem with setup times,a new multi-objective hybrid genetic algorithm(MOHGA) was proposed.
为高效地求解带调整时间的多目标流水车间调度问题,提出了一种多目标混合遗传算法,此算法依据基于Pareto优于关系的个体排序数和密度值计算适应度,保持解的多样性,并采用非劣解并行局部搜索策略,提高算法的搜索效率。
补充资料:再调时间
分子式:
CAS号:

性质:在比例积分作用(PI作用)的单元中,当输入变量阶跃变化时,输出变量达到阶跃施加后立即得到的变化值的两倍时所需要的时间。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条