说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 水电站群
1)  hydropower station group
水电站群
1.
In order to improve the exploitation ability of small hydroelectricity and direct the routine work of Shaoguan local dispatching center,such as prediction and dispatching decision,a system which can support the optimization of dispatching decision has been established for the small hydropower station group of Shaoguan power grid.
为提高小水电的开发利用能力,指导韶关地区直属调度的各水库做好预报、调度决策等工作,建设了韶关地区电网小水电站群优化调度决策支持系统。
2.
In light of the results of the research a combined optimum dispatching system was set up for hydropower station group of.
根据乌江流域总体规划、长江三峡以上防洪要求、南方电网运行特点、乌江流域水文特性等,贵州乌江水电开发有限责任公司组织开展了乌江梯级水库优化调度和发电优化控制的基本理论研究,并根据该研究建立了乌江流域水电站群联合优化调控系统,经过一系列优化调度规则、方法、措施在系统中的应用,实现了节水增发电的目的,取得了良好的社会经济效益。
2)  group of hydropower stations
水电站群
1.
For this reason, this paper puts forward a method based on the principles of system engineering and system-analysis, to conduct the long-term optimal operation of hydropower stations and reservoirs, in order to enhance a remarkable benefits and reliability of power generation of the group of hydropower stations.
水电站群长期优化运行研究的目标,是使水电站群的发电效益相应的经济价值最大。
3)  hydropower stations
水电站群
1.
For the requirement of the power system for the load, this article analyzes the key technique of daily scheduling for cascade hydropower stations.
针对电网对水电站的负荷需求,分析了水电站群日计划方式制定的关键技术,提出了基于日典型负荷的水电站群日计划运行方式的制定方法,其结果在满足系统负荷需求和水库综合利用约束下,符合兼顾调峰电量最大和发电量最大的目标。
2.
Study of Optimal Operation ANN Model in Hydropower Stations;
提出了水电站群优化调度的人工神经网络方法—BP网络方法,探讨了神经网络的网络结构、训练参数、训练方法和训练样本的改变对网络训练和应用效果的影响。
4)  small hydropower stations group
小水电站群
1.
This paper introduces the mathematical model of the optimal operation of small hydropower stations group by solving the generated energy in a hybrid method and provides the solving strategy for the optimal operation of small hydropower stations group by Genetic Algorithm(GA).
介绍了基于发电量混合求解的小水电站群优化调度的数学模型,给出了采用遗传算法的小水电站群优化调度的求解策略。
5)  hydro and thermal electric plants
水火电站群
1.
Hydraulic coupling between hydropower plants,time of delay with downstream flow and possible factors such as wasting water,must take into account in the optimal scheduling of cascade hydropower plants containing hydro and thermal electric plants.
在考虑环境保护和节约能源以及水电厂运行特点的基础上,提出了一种以火电厂总运行费用、污染气体排放量、水电厂弃水量为优化目标的水火电站群多目标优化调度模型。
6)  hydropower station group
水库水电站群
1.
Short-term optimization operation of hydropower station group of Huangbo River Basin;
黄柏河流域水库水电站群多目标短期优化调度
补充资料:日月潭水电站群
      中国台湾省最早建设又陆续扩建成为该省规模最大的水电站群。
  
  日月潭为台湾岛上著名风景区,位于浊水溪南投县境内,系由玉山和阿里山间的断裂盆地积水成潭。1931~1934年经筑坝抬高水位,并用长约15km隧洞,从浊水溪引水41.1m3/s扩建成日月潭水库,正常蓄水位748.5m。水库面积8.365km2,最大水深达 40m,总库容1.59亿m3。各电站利用它作为水库,调节水量。20世纪80年代前建有两座电厂。第一发电厂又称大观电厂,为高水头引水式,设圆筒形差动式调压井,利用日月潭与门牌潭之间的有效落差304.85m发电,最大引水流量42.3m3/s,装有5台2万kW的水斗式水轮发电机组,总装机容量10万kW,1919年8月动工,1934年7月建成发电。第二发电厂又称钜工电厂,利用大观电厂尾水渠与水里溪之间的有效落差123.64m和相同的引水流量发电,装有2台2.175万kW水轮发电机组,总装机容量为4.35万kW,1935年12月动工,1937年 9月建成发电。这些电厂供电台北、台中、高雄等市。
  
  20世纪80年代起,为了利用夜间的剩余电能满足台湾省用电增长的需要,又以日月潭为上水库,水里溪上的明湖水库为下水库,修建了装机容量为100万kW的明湖抽水蓄能电站。下水库紧靠大观水电站上游,由一座高57.5m的混凝土重力坝形成。水库容积7.4×106m3,水轮机引用流量380m3/s,水泵引用流量328m3/s,最大毛水头321m,厂房设在地下,装有4台25万kW机组。1981年4月动工,1985年8月全部建成。
  
  另一座以日月潭为上水库的明潭抽水蓄能电站也在1987年7月动工兴建,下水库在水里溪的车埕村附近,由一座高61.5m的混凝土重力坝形成,容积1200万m3。上下水库间平均水头差380m,厂房位于地下,内装6台26.7万kW抽水蓄能机组,总装机容量达160万kW,预计1992年建成,将成为亚洲最大的抽水蓄能电站。这些电站组成一个以日月潭为水源的水电站群,构成台湾省最大的水电供应基地。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条