说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 水库取水
1)  taking water from reservoir
水库取水
2)  reservoir [英]['rezəvwɑ:(r)]  [美]['rɛzɚ'vwɑr]
水库
1.
Developments in the biogeochemical cycle of mercury in reservoirs;
水库汞生物地球化学循环研究进展
2.
Investigation and Estimation of Eutrophication in Large and Medium-sized Reservoirs of the Three Gorges Reservoir in Chongqing;
三峡库区重庆段大中型水库富营养化调查及评价
3.
Environmental Impact Assessment of Water Supply Project of Mopan Mountain Reservoir in Harbin;
哈尔滨市磨盘山水库供水工程环境与卫生学评价
3)  reservoirs [英]['rezəvwɑ:]  [美]['rɛzɚ,vɔr]
水库
1.
Advance in the eutrophication models for lakes and reservoirs;
湖泊及水库富营养化模型研究综述
2.
Multi reservoirs joint operation for Baojixia Irrigation area;
宝鸡峡灌区多水库联合调节
3.
Optimal ecological sound operation of the cascade reservoirs in the lower Yalongjiang River
雅砻江下游梯级水库生态友好型优化调度
4)  water reservoir
水库
1.
Current water reservoirs mainly hidden dangers and the countermeasure for prevention and harnessing;
当前水库工程的主要隐患及防治对策
2.
My views to the problem of non gratuitous watersupply from the Qingshitan water reservoir to the Lijiang river for tourism;
关于青狮潭水库向漓江旅游有偿供水问题之我见
3.
Research on Water Reservoir Automation;
水库综合自动化系统研究
5)  Reservior
水库
1.
An Approach for Modeling on the Temporal and Spatial Distribution of P and N during the Initial Stage of Reservior Operation;
新建水库初期磷氮变化的动态模拟研究
2.
Assurement of enforcing design scheme for spillway danger removal of Tunjiang reservior
屯绛水库溢洪道除险加固设计方案的确定
3.
Design of Decision Support System for Large-Scale Reservior Flood Dispatching
大型水库防洪调度决策支持系统的开发
6)  reservoir water
库水
1.
A brief discussion on seismic design of high arch dams is made through the following three aspects:interaction of arch dams-foundation-reservoir water,dynamic stability of high arch dam abutment,effect of transverse slots on seismic design of high arch dam,and those aspects referred to above is not enough for seismic design of high arch dam.
对高拱坝的抗震设计进行了分析,包括拱坝坝体-地基-库水动力相互作用分析、高拱坝坝肩抗震稳定分析、横缝对高拱坝抗震设计的影响,仅对高拱坝抗震设计研究的几个方面进行了概括总结。
2.
In this paper feedback analysis has been made for the distribution characteristics of the reservoir water temperature field,foundation temperature field and dam body temperature field of Ertan Arch Dam.
阐述了在反馈分析中二滩拱坝库水温度场、基础温度场、坝体温度场的分布特点,并与规范建议值进行了比较。
3.
To make sure whether the recharge water source of "Qinquan Culvert " is the reservoir water or the original groundwater being the key problem of success or failure of the scheme for its anti-hazard and strengthening.
“清泉洞”穿越坝体,是大坝工程隐患,搞清楚“清泉洞”的补给水源是库水补给,还是原地下水补给,是除险加固方案成败的关键。
补充资料:地表水取水构筑物勘察


地表水取水构筑物勘察
investigation of surface water catchment structure

为:管坯约2.1~1.15t,燃料约2.7~3·IGJ,电力约surfaee water eatehment strueture)为地表100~nokw·h。水取水构筑物的设计和施工而进行的工程地质勘察。 (宋本仁)地表水一般是工业生产和生活用水的主要水源。地表 水取水构筑物常设置在江河岸边或伸入河床中(见dibiao Shui qushui gouzhuwu kanCha图),其基础埋深受江河最低水位或最大冲刷深度控地表水取水构筑物勘察(investigation of制,通常埋深较大。架含分j母一 地表水取水构筑物示意图 。一河床式取水构筑物,1一取水失部,2一自流管;3一进水孔 b一岸边式取水构筑物;1一集水井;2一水泵房;3一闸阀井 勘察阶段与设计阶段相适应,一般分为选址勘察阶段、初步勘察阶段和详细勘察阶段。 (l)选址勘察。以搜集已有地形地质、气象水文资料和现场踏勘为主,重点调查:河段形态、流态特征,河曲变化趋势,岸坡形态和稳定性,毗邻的山坡是否稳定,有无威胁场地安全的冲沟和泥石流,水位变化幅度,河床冲淤情况等。对拟建场地的适宜性和稳定性作出初步评价,推荐最优场址方案。 (2)初步勘察。以工程地质测绘、工程地质勘探、试验为手段,重点查明:地质构造,地基土的构成、岩性,岩土的物理力学性质,地下水条件,地层的渗透性,有无软土、流砂等不良地层及其分布,不良地质现象的发育程度等。为总图的布置、构筑物选型、施工方法选择提供可靠的工程地质资料。勘探线和勘探点间距,根据地质条件和构筑物特点确定。勘探深度在河床区要达到最大冲刷深度以下3一sm,在岸边区要达到最低水位以下s~lom。 (3)详细勘察。以勘探、试验为主,为取水构筑物的设计、施工和防治措施提供详细的工程地质资料和设计所需的岩土计算参数;预测施工降水产生涌土、流砂的可能性;对于用沉井施工的工程,还要评价地层的均匀性,并根据地质条件提出地基处理、施工方法和防治不良地质现象的建议。 (何匆,1).。目J,二二才.、*、,二。J,。二、二.二、·,~。、~·。~
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条