说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 北方水库
1)  northern reservoir
北方水库
2)  Beitang Reservoir
北塘水库
1.
Effect of Salt Release from Sediment on Water Quality of Beitang Reservoir;
底泥盐分释放对北塘水库水质成化的影响
2.
Impact Factors on Salt Release from Beitang Reservoir Sediment;
北塘水库底泥盐分释放的影响因子研究
3.
In an attempt to summarizing the previous work, and analyze the hydrometeorological, geological and hydrogeological condition of Beitang reservoir, in Tianjing city, the hydraulic conductivity (K) of the reservoir bottom stratum and its spatial random distribution were determined by using field hydro-geological investigation and grain size analysis in the laboratory.
本文以天津市北塘水库为研究对象,在总结前人研究成果、分析北塘水库地区的水文气象、地质、水文地质条件的基础上,通过野外水文地质勘探、取样与室内颗粒分析实验相结合的手段,获取了库底地层的渗透系数,探讨了库底地层渗透系数的空间随机分布。
3)  Baimiao Reservoir
北庙水库
1.
Report of Water Quality in Baimiao Reservoir;
保山市北庙水库水质安全性分析
4)  Bai ao Reservoir
北岙水库
1.
The system design of water regime auto-monitoring in Bai ao Reservoir is demostrated by theoretical analysis and on-spot electrical measurement based on local characteristics and advanced experiences.
北岙水库水情自动测报系统设计方案,是结合当地的实际情况和特点,并借鉴其他工程的先进经验比较确定的。
5)  Beidagang Reservoir
北大港水库
1.
Study on Water Storage of Beidagang Reservoir and Real-time Flood Dispatch;
北大港水库蓄水及洪水实时调度研究
2.
This paper describes the dynamic process in the simulation of water quality of Beidagang Reservoir,a reservoir for the storage of water from the Yellow River for the water supply in Tianjin and a part of SouthNorth Water Transfer Project.
建立水动力、水体污染物输运及底泥污染物输运数值模型,采用有限差分与有限体积相结合的方法,对北大港水库氯离子进行动态数值模拟。
3.
This paper takes Beidagang reservoir as an example, and describes the dynamic process in the simulation of water quality, and the general rules about the release of contamination in sediment were obtained.
本文以北大港水库为例,运用数值模拟方法进行了水质模拟研究,并通过优化调度方式,确保水库水质安全,并通过对底泥污染物释放的模拟分析得出底泥释放的影响因素,为水质安全研究提供科学依据。
6)  Xibeikou reservoir
西北口水库
1.
Being the first 100m high concrete-faced rockfill dam in China,the Xibeikou reservoir dam is included in the national(seventh) 5yr-plan scientific and technologic key problem-tackling project.
西北口水库大坝作为我国第1座百米级坝高的混凝土面板堆石坝被列入国家"七五"科技攻关项目,大坝投入运行以来,右坝肩即存在小股水流渗漏现象。
补充资料:水库调节防凌(见水库调度)


水库调节防凌(见水库调度)


shuiku tiaoiie fangling水库调节防凌见水库调度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条