说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 预应力施工
1)  prestress construction
预应力施工
1.
The concrete construction and prestress construction of box beam are briefly elaborated as well as key points for measurement control in construction process,in order to provide references for similar works.
结合淤泥河大桥工程概况,从挂篮的设计技术参数选择、选型、构造及安装详细介绍了挂篮悬浇施工技术,简要阐述了箱梁混凝土施工和箱梁预应力施工,探讨了施工过程测量控制的要点,并得出了一些有益于施工的结论,以供参考借鉴。
2)  prestressed construction
预应力施工
1.
This paper introduces the prestressed construction technique of the beam of Weiyun River extra long bridge with cable stayed concrete continuous truss.
本文介绍了卫运河特大桥斜拉式混凝土连续桁梁预应力施工技术,对复杂预应力结构的孔道成孔方法、钢铰线张拉顺序的确定、张拉力控制方法、孔道压浆工艺进行了详细论述,提出了预应力施工中有关施工计算的方法,并对卫运河桥桁梁结构施工进行了简要介绍。
3)  prestress construction technology
预应力施工技术
1.
The prestress construction technology of two parts is introduced in detail.
论述了两部分结构的预应力施工技术,结合施工仿真计算和现场实测结果,提出了此类结构的预应力施工技术和特点。
2.
The prestress construction technology of Badminton Gymnasium is introduced in detail.
详细介绍了该工程的预应力施工技术,结合施工仿真计算和实测结果,提出了结构的预应力施工技术和特点。
4)  tensioning process control
预应力施工控制
5)  construction prestressed cable
预应力锚索施工
1.
It indicate that the construction prestressed cable have succeed through the construction excaration and rock plug blasting.
开挖施工和岩塞爆破检验表明 ,预应力锚索施工获得成功 ,对集碴坑边墙和顶拱的整体性起到了很好的加固作用 ,对今后类似工程进行预应力锚索施工提供了经
6)  decision of stretching scheme
预应力施工方案决策
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条