说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 水库穿坝涵管
1)  Reservoir trans-dam culvert
水库穿坝涵管
2)  rebuilding trans-dam culvert
穿坝涵管改建
1.
The author summarized the experience of Luzhai county in rebuilding trans-dam culvert by conduit jacking method,introduced the construction procedures,application characteristics and advantages,and presented an economic,safe,rapid and reliable construction method for quick rebuilding of reservoir trans-dam culvert.
总结了鹿寨县多年来采用顶管施工法在改建穿坝涵管中的经验,论述了顶管技术改建穿坝涵管的施工工序、应用特点及其优势,为加快水库穿坝涵管改建提出了经济、安全、快速而可靠的施工方法。
3)  auxiliary dam culvert pipe
副坝涵管
4)  concrete conduit under embankment
坝下涵管
1.
The feasibility of using flexible compound fiber pipe as the inner lining to reinforce the concrete conduit under embankment is studied.
分析了应用柔性复合纤维管作为内衬来加固受损的坝下涵管的可行性,对复合纤维管内衬的抗剥离强度进行了有限元的计算。
5)  Reservoir [英]['rezəvwɑ:(r)]  [美]['rɛzɚ'vwɑr]
水库涵洞
1.
Study on the Cause of Formation for the Worsen Environment of Reservoir Culvert;
水库涵洞环境恶化成因研究
6)  reservoir dam
水库大坝
1.
Introduction on emergency preparedness plan of reservoir dam safety management;
水库大坝安全管理应急预案浅谈
2.
Quality control of consolidation project of Xiaohekou reservoir dam in Yicheng;
翼城小河口水库大坝加高培厚工程中的质量控制
3.
Influence of 5·12 earthquake on Fengjiashan reservoir dam;
浅析“5·12”地震对冯家山水库大坝的影响
补充资料:福建省第二座碾压混凝土坝——龙门滩一级水库


福建省第二座碾压混凝土坝——龙门滩一级水库


目 福建省第二座碾压混凝土坝— 龙门滩一级水库
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条