1)  Composite center wall
复合式中墙
2)  composite wing wall
复合式翼墙
1.
The composite wing wall with staggered rigid wing wall and reinforced earth has fulfilled the requirement of stability against sliding and seepage.
采用刚性翼墙与加筋土间隔、上下错开的布置型式,形成复合式翼墙结构,满足挡墙的抗滑稳定性及防渗要求。
3)  superposed partition wall
叠合式中墙
1.
Xiaoyangshan tunnel is the first double-arched tunnel with superposed partition wall("Superposed partition wall" is used in the paper to distinguish from the composite partition wall specified in "Design Specification for Highway Tunnel") in China.
小洋山隧道在国内首先使用了叠合式中墙(为避免与设计规范复合式中墙相混淆)双连拱隧道结构形式。
4)  composite thrust wall
复合式后背墙
1.
Reaction distribution investigation and structural analysis of composite thrust wall of rectangular pipe jacking shaft;
顶管矩形工作井复合式后背墙反力分布研究
5)  deep-mixed pile with soilnailing
复合土钉墙形式
6)  composite soil-nailing wall
复合式土钉墙
补充资料:装配式大墙板建筑
      将预制的内、外墙板、楼板、屋面板、楼梯段等配套构件组装成以承重墙板为主的全装配板式结构的房屋。
  
  20世纪30年代苏联进行了装配式墙板建筑的试制,50年代推广应用。至1980年,建造量占当年住宅建造量的60%以上。1954年法国建成年产20000户的预制大墙板厂。在此期间东欧、北欧、朝鲜和日本也都有较大发展。中国自1959年在北京修建第一幢装配式墙板工程以来,全国一些省市自治区相继推广采用,多为5~16层住宅。装配式建筑,由于其大部分工作在工厂进行,为建筑工业化创造了有利条件。具有施工机械化程度高、工期短、现场用工少、湿作业少、受季节影响小等优点。装配式建筑对构件制作和吊装的精度要求较高,须有科学的施工组织管理,方能保证工程质量。
  
  分类  按材料分为普通钢筋混凝土板、隔热性能好的轻集料混凝土板、振动砖壁板和粉煤灰、矿渣等工业废料制成的板。按成型方式分为单一材料的实心板和空心板、钢筋混凝土和保温材料复合成型板。
  
  节点构造  构件连接要满足强度和延性的要求,并方便施工。节点有以下几种:①湿接头。将预留钢筋绑扎或焊接后用混凝土灌筑成整体。②干接头。将构件接头部位预埋的钢板或型钢用锚固铁件互相焊在一起,用砂浆或混凝土做保护层。③机械接头。将接头部位预留孔洞或预埋螺母用螺栓连接。④预应力接头。对预留钢筋或钢丝预应力张拉后将物件连接起来。
  
  构件制作、运输和吊装  建立永久性、半永久性预制构件厂或在现场预制(见混凝土构件预制工艺、预制混凝土墙板)。构件运输通常选用载重量为 6~20吨的运输车。常用的吊装机械为塔式起重机。
  
  展望  装配式墙板构件生产厂,投资额较大,投产后不易改产,因此这类建筑适用于较大规模的建筑群。80年代以来,各国均从构件定型化、产品系列化和组合多样化方面入手,扩大使用功能。发展大开间,采用多功能一次成型带饰面的外墙板,使用轻质材料,改进连接,缩短工期,为扩大装配式建筑的适用范围,创造条件。
  