1)  pouring
灌筑
2)  pouring sequence
灌筑顺序
1.
Through the analysis of the sequence of concrete pouring for dumbbell shape steel tubular concrete arch bridge using FEM,the impact of the pouring sequence on arch rib is clear.
利用有限单元法对杭州某哑铃形钢管混凝土拱桥混凝土不同灌筑过程的有限元分析 ,主要是对各种不同的灌筑顺序对相关控制截面内应力影响的分析比较 ,得出类似拱桥中混凝土灌筑顺序对拱肋的影响关系 ,作为桥梁设计、施工的参考 ,使得此类型拱桥的混凝土灌筑施工过程更趋合理、安
3)  cantilevered concrete pouring
悬臂灌筑
1.
Combining with construction practice, six technical key problems in the con-struction of cantilevered concrete pouring of continuous beam are discussed, including large a-mount concrete pouring in one time,de formation control for large span continuous beam,preven-tion concrete from crack and structural system transform etc.
结合施工实践,详细阐述了连续梁悬臂灌筑施工中大体积混凝土一次灌注成型、大跨及长联连续梁挠曲和变形控制、施加预应力和防止混凝土开裂、长联及多跨连续梁体系转换等六大关键技术问题。
4)  cast-in situ pile
灌筑桩
5)  drilling pile
钻孔灌筑桩
6)  concrete pouring
混凝土灌筑
1.
Discussions were made on deign and fabrication of in ner form, and technology for concrete pouring of the simple support and continu ous beam.
针对高速铁路先简支后连续梁的内模设计、制造及先简支后连续法梁体混凝土灌筑、施工工艺进行探讨。
参考词条
补充资料:筑台(一作城)词(汉武筑通天台,役者苦之
【诗文】:
前杵与后杵,筑城声不住。我愿筑更高,得见秦皇墓。



【注释】:



【出处】:
全唐诗:卷585-25
说明:补充资料仅用于学习参考,请勿用于其它任何用途。