1)  the way of cantilever concreting
悬臂浇注施工
2)  cantilever construction
现浇悬臂施工
1.
Jiuweigang bridge was constructed with cantilever construction,this construction has higher technical requirements,so the bridge was supervised and controlled in the whole construction.
九圩港大桥采用挂篮现浇悬臂施工,施工技术要求高,为使得该桥顺利合拢,符合设计要求,对该桥进行了施工控制。
2.
The continuous prestressed beam was constructed with cantilever construction,this construction was high of technology,so the bridge was supervised and controlled in the whole construction.
预应力混凝土连续梁桥采用挂篮现浇悬臂施工,施工技术要求高,为使得该桥顺利合拢,符合设计要求,对该桥进行施工控制。
3)  cast-in-place construction of cantilevers
悬臂现浇施工
4)  case-in-place cantilever method
悬臂浇筑法施工
5)  cast-in-place cantilever method
悬臂浇筑施工
1.
The paper takes a bridge as an object of the study and focuses on the research of two points including structure analysis and high-pier buckling analysis of prestressed concrete continuous rigid frame bridge in construction with the cast-in-place cantilever method.
本文以某三跨连续箱梁悬臂施工阶段的过程模拟,针对连续刚构桥悬臂浇筑施工中的结构分析方法、高墩稳定性两个方面的问题进行了深入研究。
6)  cantilever casting
悬臂浇注
1.
The hanging baskets are the main equipments in the cantilever casting construction of large-scale prestressed concrete continuous rigid bridge and continuous girder bridge.
挂篮是目前大跨径预应力混凝土连续刚构桥和连续梁桥在悬臂浇注施工时主要采用的施工设备。
2.
In order to demonstrate the feasibility of the construction technique of cantilever casting of a reinforced concrete arch bridge and the rationality of cable force adjustment and construction control,a model test of cantilever casting construction was made by taking the No.
为验证钢筋混凝土拱桥悬臂浇注施工工艺的可行性和安全性,以白沙沟1#大桥为工程背景,进行了悬臂浇注施工全过程模型试验;测试了拱圈变形、控制断面应力和扣索索力,并与有限元法计算结果进行了比较,二者基本相符。
3.
According to the case of Wusongjiang super bridge continuous box-girder cantilever casting construction,the nacelle design principle and typical construction scheme show that nacelle design is uncertain.
结合吴淞江特大桥连续箱梁悬臂浇注施工案例,有关挂篮设计原则和具体施工方案表明,挂篮设计是无定性的,只有结合桥梁结构自身的特点和施工能力,才能取得较好的效果。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。