1)  step-by-step method
递进法
1.
Because of no existing road available,high cost for temporary road,and a huge damage to the Surroundings,when constructing highways in desert,step-by-step method was used usually.
沙漠公路由于地处沙漠,无现成道路可供施工使用,修筑便道成本费用高,且对环境破坏较大,一般采用递进法施工。
2)  automatically step-up method
自动递进法
1.
A novel automatically step-up method (ASUM) to analyze creep and shrinkage effects at any time is presented.
首先将预应力混凝土桥梁中考虑收缩、徐变影响的任意时刻混凝土应力、应变关系在持荷时段内写成代数形式,引入内力平衡方程及变形协调条件后,提出了计入截面上钢筋位置、配筋率、预应力钢筋松弛、混凝土弹性模量随时间变化等影响的徐变效应分析的全量形式自动递进法,并建立了计算式,适用于任何形式的收缩、徐变特性表达式;基于建立的全量形式公式,可方便地求解任意时刻混凝土、钢筋的应力与应变和梁体竖向变形。
3)  Monte Carlo Iteration
Monte Carlo递进法
1.
Two new methods, diagrammatical approximation and Monte Carlo Iteration, are introduced to search for design point and acquire reliability index.
介绍了基于几何原理求解可靠指标、寻找设计验算点的具有较高实用价值的两种新算法: 图解渐近法和Monte Carlo递进法
4)  layering method
层次递进法
1.
One is layering method, in which the problem that the complex system s mathematical model is too enormous or can t be built completely can be solved.
针对某些被诊断系统结构比较复杂 ,数学模型或无法完整求出或过于庞大以及测量信息的有限性等特征 ,提出了动态系统故障检测与诊断的层次递进法和模型跟踪法 ,据此能极大地提高检诊效率 ,实现实时跟踪检
5)  cycle
循环递进法
6)  automatically step-up method
全量形式自动递进法
1.
A precision-controllable general approach (PCGA) to analyze time-dependent effect in prestressed concrete structures is presented by using finite element method (FEM) and automatically step-up method (ASUM).
基于杆系有限单元法和时变效应分析的全量形式自动递进法,提出了可控制精度的预应力混凝土杆系结构时变效应通用分析法。
补充资料:递进
一层比一层深入:逐层递进|句子间的递进关系。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。