1) Tengzigou Hydropower Station
![点击朗读](/dictall/images/read.gif)
藤子沟水电站
1.
Construction & Quality Control of Concrete Arch Dam of Tengzigou Hydropower Station;
![点击朗读](/dictall/images/read.gif)
藤子沟水电站混凝土拱坝施工与质量控制
2) Shuanggou water power station
![点击朗读](/dictall/images/read.gif)
双沟水电站
1.
Discharge ice in construction period and discharge ice measures in Shuanggou water power station;
双沟水电站施工期过冰及渡凌措施
3) Shagou Hydropower Station
![点击朗读](/dictall/images/read.gif)
沙沟水电站
1.
As the topographic condition is limited,the conventional energy dissipating mode can not meet the relevant requirements of Shagou Hydropower Station,a tank-type energy dissipator is suggested to be used there;for which,there is no existed experiences for the desi.
沙沟水电站受地形条件限制,采用常规的消能方式满足不了要求,故采用箱式半压力消能工。
4) Shenxigou hydropower station
![点击朗读](/dictall/images/read.gif)
深溪沟水电站
1.
Foundation Treatment Construction of the Inlet Cofferdam of Diversion Tunnel of Shenxigou Hydropower Station;
深溪沟水电站导流洞进口围堰基础处理施工
2.
Study on the Seepage Treatment During the Construction of Diversion Tunnel of Shenxigou Hydropower Station;
深溪沟水电站导流洞施工期渗水处理方案研究
3.
Shenxigou hydropower station is being built on the middle reach of the Dadu River , with installed capacity of 660MW and annual power generation of 3203 GWh and will be cascade power station downstream of Pubugou hydropower station.
深溪沟水电站装机容量660MW,年发电量32。
5) Pubugou hydropower station
![点击朗读](/dictall/images/read.gif)
瀑布沟水电站
1.
Dam Construction Simulation System of Pubugou Hydropower Station based on Data driving;
![点击朗读](/dictall/images/read.gif)
基于数据驱动的瀑布沟水电站大坝施工仿真系统
2.
Acceptance test of turbine model for Pubugou Hydropower Station;
![点击朗读](/dictall/images/read.gif)
瀑布沟水电站水轮机模型验收试验
3.
Study on hydraulic model test of river closure in Pubugou hydropower station;
![点击朗读](/dictall/images/read.gif)
瀑布沟水电站截流水力学模型试验研究
6) Pubugou Hydroelectric Power Station
![点击朗读](/dictall/images/read.gif)
瀑布沟水电站
1.
Analysis of Pubugou Hydroelectric Power Station Underground Power House Rock Mass Seepage Field Impacts on Surrounding Rock Stability;
瀑布沟水电站地下厂房岩体渗流场对围岩稳定的影响分析
2.
In regard to the continuity,abundance and safety,the relia-bility analyses on various schernes of electric one-line diagrain was made on the basis of reliability calculationof electric one-line diagram for Pubugou hydroelectric power station.
并结合瀑布沟水电站电气主接线可靠性计算,从供电连续住、充裕性、安全性等方面对各接线方案进行了可靠性分析,对SF6管道母线、500kV电缆等设备故障参数的不确定性,作了参数敏感性分析。
补充资料:樯藤子皂苷
分子式:
CAS号:
性质:又称过岗龙皂苷。无色针状结晶。熔点223~225℃。旋光度-25.8º(甲醇),可溶于水及小分子醇类,难溶于丙酮及乙酸乙酯,水解后生成过岗龙酸及阿拉伯糖和木质糖,据红外光谱推测糖是与过岗龙酸分子中的羧基相结合。来源于豆科植物磕藤子[Entada phaseoloides(L.)Merr.]的种仁。动物实验显示具有抗肿瘤活性。
CAS号:
性质:又称过岗龙皂苷。无色针状结晶。熔点223~225℃。旋光度-25.8º(甲醇),可溶于水及小分子醇类,难溶于丙酮及乙酸乙酯,水解后生成过岗龙酸及阿拉伯糖和木质糖,据红外光谱推测糖是与过岗龙酸分子中的羧基相结合。来源于豆科植物磕藤子[Entada phaseoloides(L.)Merr.]的种仁。动物实验显示具有抗肿瘤活性。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条