1) opening-closing-opening test
分合分试验
2) mixed-mode test
混合型分层试验
3) experiment analysis
试验分析
1.
Construction structure adhesive viscosity and thixotropic experiment analysis;
建筑结构胶粘剂粘度及触变性试验分析
4) experimental analysis
试验分析
1.
A structure and performance experimental analysis of a new cylindrical refiner;
新型圆柱磨浆机的结构及其性能试验分析
2.
The structure characteristics and experimental analysis of the produce line of cold-rolling screw thread steel reinforcing bar;
冷轧螺纹钢筋生产线的结构特点及试验分析
3.
Design and experimental analysis on household Wind/Pv generation system in the lakes of northern Jiangsu province
苏北湖区户用风光互补发电系统的设计与试验分析
6) test analysis
试验分析
1.
Construction characteristic and test analysis of MG300BW type thin seam coal winning machine;
MG300BW型薄煤层采煤机结构特点及试验分析
2.
Design of non-binding prestressed concrete compact rib raft foundation and test analysis;
无粘结预应力砼密肋式片筏基础的设计和试验分析
3.
Analytical solution and test analysis of vertical tip bearing capacity of large diameter belled pile
大直径扩底桩竖向端承力解析解与试验分析
补充资料:分合岛
小岛有时自行分离成两个小岛,有时又会自动合成一个小岛。分开和合拢的时间没有规律,少则1至2天,多则3至4天。分开时,两部分相距4米左右,合并时又成为一个整体。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条