说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 快速施工组织
1)  fast construction organization
快速施工组织
2)  fast construction
快速施工
1.
Study on fast construction technology of Dahuashui RCC High-thin Arch Dam;
大花水碾压混凝土高薄拱坝快速施工技术研究
2.
Study on Fast Construction Technology for Moxi NO.2 Tunnel;
磨溪二号铁路隧道快速施工技术研究
3.
Research on Fast Construction and Numerical Simulation of Settlement for High Embankment;
高填路堤快速施工及沉降的数值仿真研究
3)  rapid construction
快速施工
1.
Study on potential probing system for rapid construction of vertical shaft;
立井井筒快速施工挖潜的系统研究
2.
Analysis of the mechanical effect on rapid construction of super-long soft surrounding rock tunnel with high water content;
特长富水软弱围岩隧道快速施工力学效应
4)  quick construction
快速施工
1.
Concrete quick construction for shifting the temporary ship-lock to silt sluice in the Three Gorges Project;
三峡临时船闸改建冲沙闸项目混凝土快速施工
2.
Futhermore,the experiences of quick construction of tunnel are accumulated.
在台缙高速公路长石隧道工程施工中,根据不同围岩的地质条件,采用较经济可行的施工方法和技术措施,积累了隧道快速施工的经验。
3.
Introduce quick construction technology of reinforced concrete oblong assembly culvert following “protecting permafrost soil” principle—winter construction.
介绍多年冻土区拼装式钢筋混凝土矩形涵洞快速施工技术,按照保护多年冻土的原则,选择寒季施工。
5)  speedy construction
快速施工
1.
Some other construction performances and experiences are introduced and an efficienty way of reaching a high quality and speedy construction in the baserock section of the vertical shafts are also discassed.
本文对其施工方法和施工经验进行介绍,并探讨了立井基岩段实现优质高效、快速施工的有效途径,为立井基岩段快速施工提供了依据。
2.
The speedy construction with borehole, longhole drilling and blasting method at the freezing baserock section in №2 mine of Xuandong has been introduced.
介绍了宣东二矿主井井筒冻结段快速施工方面的经验。
6)  high-speed construction
快速施工
1.
It simply introduces the concept of high filling embankment,combining with engineering practice,synthetically considers high-speed construction of high filling embankment from some factors,disposal of natural foundation,padding,compaction,add-tendon soil,pouring starch to make up for better,in order to meet foundation engineering quality and demand of project time.
简要介绍了高填方路堤的概念,结合工程实际,从天然地基处理、填料、普通压实、强夯补压、加筋土、注浆补强等各方面,综合考虑高填方路堤快速施工,以满足路基工程质量与工期要求。
2.
According to the engineering features, the key to organize a high-speed construction is to choose an appropriate scheme.
根据工程特点,选择合理的施工方案是组织快速施工的关键。
3.
It implemented continuous high-quality and high-speed construction of vertical shaft.
2m,实现了立井井筒连续优质快速施工。
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条