1) soil under pile cap
桩帽下土体
2) soil besides pile cap
桩帽间土体
3) concrete pile follower
混凝土桩帽
4) soil around pile
桩周土体
1.
By burying pore water pressure gauges at the side of the piles,the variation discipline of the pore water pressure in saturated powder soil around piles is studied,and the mechanism of deformation displacement of soil body around piles caused by constructions during the process of construction of the pressure pumped CFG pile by continuous auger drilling is discussed.
通过在施工现场埋设孔隙水压力计,研究了长螺旋钻管内泵压CFG桩施工过程中,桩周饱和粉土中孔隙水压力的变化规律,探讨了施工引起桩周土体变形的机理。
5) pile-soil system
桩土体系
1.
Along with the high speed developing of country economic, high speed and heavy load come to be the basic characteristic of road and railage, while traffic load will put on the buildings pile-soil system nest to the road.
随着国民经济的发展,高速和重载成为了公路和铁路运输业的基本发展方向,而在这新形势下道路两侧建筑物桩土体系将受交通动荷载的影响。
6) soil under pile
桩基土体
补充资料:下土
1.大地。 2.四方;天下。 3.指人间。 4.偏远的地方。 5.低洼之地。《书.禹贡》:"厥土惟壤﹐下土坟垆。"孔传:"高者壤﹐下者垆。"一说﹐下等土地。孙星衍注引马融曰:"豫州地有三等﹐下者坟垆也。"
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条