1)  hydraulic engineering water supply price
工程水价
1.
The author introduces hydraulic engineering water supply price s composition,its measurement projects and the methods.
介绍了工程水价的构成,测算项目,计算方法,重点探讨了逐步结转成本法测算各环节水价的方法和步骤,即各供水环节的水价,包括上一环节的原水价格和工程本身的成本、费用、税金及利润;供水最终环节的水价,除包括上一环节的原水价格和工程本身的成本、费用、税金及利润外,还应包括水资源费。
2)  Engineering
工程
1.
Exerting of Engineering Technique in Prevention and Caring Agricultural Non-point Source Pollution in Developed Areas;
发达地区防治农业面源污染的工程技术运用
2.
Countermeasure and discussion for some technical problems engineering experiment of closed-cell aluminum foam;
泡沫铝工程化生产中某些技术问题的探讨及对策
3.
Analysis of large purification engineering design for high sulfur-content natural gas;
大型高含硫天然气净化工程设计浅析
3)  project
工程
1.
On the safety management of construction project program;
浅议建设工程项目的安全管理
2.
Survey of security pre-appraisement for a new project of cogeneration;
对某热电联产新建工程安全预评价综述
3.
Introduction to Gejiu Non-ferrous Smelting and Chemical Co.' s sulphuric acid plant based on low-SO_2 copper off-gas in phase one project;
个旧有色冶化公司一期低浓度铜烟气制酸工程简介
4)  construction
工程
1.
The Formative Reason of Permafrost Region on Qinghai Xizang Plateau and Their Influence on Construction;
青藏高原多年冻土区的成因及对工程建设的影响
2.
Ways of managing construction items for the construction unit;
建设方如何进行工程项目管理
3.
Now in China,many accidents happened in the construction process.
建筑工程安全事故多发,作为参与工程的重要一方——工程建设单位,不应忽视其自身在安全管理中的重要作用,本文通过对目前建设工程安全管理现状的分析及与国外管理方法的比较,对如何加强建设单位的安全管理意识、提高建设单位的安全管理水平提出几点建议和看法。
5)  engineer
工程
1.
The restrictive factors in cultivating creative engineering talents in university and its countermeasures;
论高校工程类创新人才培养的制约因素及其对策
2.
The Fire Protection Design Plan Research about 100kt/a MPVC Engineer Enlarged by YIBIN TIANYUAN Co.Lit;
宜宾天原股份有限公司100kt/a本体法PVC聚合扩建工程消防设计方案研究
3.
e garment master of designing, engineering and managing.
将服装师分为三种类型 ,即服装设计师、服装工程师与服装经营师 ,分析了这三类服装师的特点及概念 ,提出了优秀的服装师应具备此三种能力的观
6)  works
工程
1.
The paper introduces how to control the cost of construction works from item decision-making phase, design phase, tender phase, construction phase and settlement phase.
从项目决策阶段、设计阶段、招投标阶段、施工阶段,竣工结算阶段等几个方面对建设工程造价控制做了介绍。
2.
The theoretical formula by cross-area method for measurement of earthwork and stonework quantities in dredging and damming works with trapezium cross section is derived.
推导了梯形横断面的航道疏浚和筑坝工程采用断面面积法进行土石方计量的理论公式 ,通过误差分析 ,得出现行计算公式存在理论正误差 ,提出了减少计量误差措施。
参考词条
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)


坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle

一““、、’v‘丈人1以gUflgCnengChe坦克维修工程车(:artk Inaintenane。%26repair vehicle)装有坦克维修设备、仪器、工具的技术保障车辆。见坦克保养工程车、坦克修理工程车。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。