说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 发电容量投资
1)  generation capacity investment
发电容量投资
1.
In order to analyze the relation between two-part electricity price and generation capacity investment in free competition regional electricity market,an electricity price model in power market is constructed based on system dynamics,which is consisted by four modules including electricity supply,demand,capacity price and new capacity investment.
为研究自由竞争的电力市场中,两部制电价和发电容量投资间的作用效果,基于系统动力学理论,从系统和反馈的角度出发,构建了一个由电力供给、电力需求、容量电价和新容量投资4个模块组成的电力市场价格模型。
2)  investment in power generation
发电投资
3)  generation investment
发电投资
1.
System dynamics model for generation investment;
电力市场发电投资的系统动力学模型
2.
Hence, in addition to the uncertain factors, the investment strategies of other generation companies should also be taken into account when making generation investment decisions.
电力工业的市场化改革为发电投资决策带来了更多的不确定因素,也引起了风险。
3.
In power market, such uncertain factors have been introduced for generation investment decision-making as the competition from other generating companies (Gencos) and the variation of investment value, whose influences are usually neglected in traditional methods of generation expansion planning.
电力市场中,发电商进行发电投资决策时面临着其他发电商的竞争和项目投资价值的不确定性等因素,这些因素在传统发电规划方法中基本被忽略。
4)  capacitor value of on-or-off-switch
投切电容量
5)  generation capacity
发电容量
1.
Optimization design of generation capacity adequacy based on integrated resource planning;
综合资源规划下发电容量充裕度的优化设计方法
2.
The adequacy analysis system of generation capacity in electricity market could be used to analyze the level of the generation capacity adequacy in electricity market, and provide the support to power system operation and investment.
电力市场发电容量充裕度分析系统可以用来分析电力市场环境下的发电容量充裕度水平, 为系统的运行和电力的投资提供支持。
3.
A dynamic simulation model was built to solve the setting of two key parameters,the energy price cap and the capacity price,in the generation market,and was then used to analyze the generation capacity development in various scenarios.
针对发电竞争市场中的两项关键参数——能量价格上限和容量价格的设置问题,研究提出了发电容量动态仿真模型,运用该模型对不同情形下的发电容量增长趋势进行了模拟仿真。
6)  investment capacity strategies
容量投资策略
补充资料:发电机组有效载荷容量


发电机组有效载荷容量
effective load carrying capability of generat-ing unit

fod一anj一Zu youxlao zal触rong}‘Ong发电机组有效狡荷容t(effeetive IOad。arry-ing eapability of generating unit)发电机组板定容量减去为保持系统风险度不变所需预留的备用容量后的值.用公式表示为 C~C一△天(1)式中G为发电机组有效载荷容t;C为发电机组额定容量;△尺为系统所需备用容量。就是当系统扩建一台新机组后,该机组所能承担的系统负荷须小于机组的额定容量,才能使系统相对备用容t不变,从而使系统风险度保持不变。 计算方法由容量模型的递推公式(见发电系统模型)可知,当系统中增加一台额定容t为C,强迫停运率为q的发电机组时,系统停运容t等于和大于X的累积概率变为 P(X)二P‘(X)(1一叮)+P‘(X一C)叮(2)式中尸,(X)是未追加机组时的泉积概率,尸(X)是追加以后的新值。由式(2)可知尸(X)>Pl(X).因此,在增加一台机组后当停运容t均为X时,系统的风险度增大了.为使系统风险度仍保持为尸‘(X)的值,必须增加系统的备用容量。设此备用容t由新机组容量C中扣出其值为△尺,则由式(2)可写出下面的关系式 尸(X+△尺)一尸,(X+△尺)(1一q)+尸‘ (X+△尺一C)叮二P‘(X)只考虑上式右端等式,并略去尸上的符号“‘”即得 P(X+△尺)(l一口)+P(X+△尺一C),=P(X)(3)要求得△尺的值,必须知道系统容t模型中尸(X)的解析表达式,但这是有困难的。为此,可利用指数曲线来局部地拟合尸(X)与X的函数关系(见发电系统风险特性系数),有 尸(x)一刀e一丢(4)式中m为系统风险特性系数;B为常数.将式(4)的关系应用于式(3)后,在等式两端取对数,经过简单运算可得 战=。In〔(1一。)+。e景〕 一mln[(1一。)+。e景](5) 将式(5)代人式(1),最后求得此新发电机组的有效载荷容t为 c’=c一从一e一m一n〔(l一。)+。e轰](6)由此可知,C.不仅与机组本身的强迫停运率q(见电力系统可幸性基本数据)有关,且与系统风险特性系统数m有关。不难证明,q越小或二越大,C。越接近C。 应用在长期电源发展规划中,应用机组有效载荷容量代替额定容量,可在保持系统风险度不变的判据下,确定合理的装机类型和进度,以适应系统负荷的增长。此外,应用等风险度法安排发电系统机组检修计划时,将机组有效载荷容量与负荷模型结合,可以求得优化的结果(见发电系统检修计划优化)。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条