说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 节点连接
1)  connection [英][kə'nekʃn]  [美][kə'nɛkʃən]
节点连接
1.
This article analyzes the failure mechanism for the tensile connection using high strength bolts with extended end plate or T-shaped steel and the causes of prying action.
通过算例分析和比较了国内外几种高强螺栓节点连接考虑杠杆力作用的计算方法,为工程设计提供参考依据。
2.
It is in favor of beam-column connection and architecture design, so it has good development foreground.
本文采用试验研究、理论分析、有限元程序分析相结合的方法,对钢管混凝土柱钢筋混凝土梁新型节点连接的形式进行了系统的分析与研究。
3.
The connection is an important and complicated content in the steel frame design.
钢结构梁柱节点连接是钢结构设计中的重要内容之一,节点连接的可靠性和有效性对钢结构整体性能有着非常重要的影响。
2)  connection [英][kə'nekʃn]  [美][kə'nɛkʃən]
连接节点
1.
Nonlinear finite element analysis of CFRT connection with dentation plate;
钢管混凝土梁柱齿状钢板连接节点非线性有限元分析
2.
Based on the model tests and numerical calculation,mechanic behavior of connection between composite beam and concrete shear wall in the main building of Achieves Exhibition Hall of Pudong New District in Shanghai is studied.
以上海市浦东新区文献中心主楼组合梁与混凝土剪力墙新型连接节点为对象,通过模型试验和数值分析研究了大尺寸方钢与混凝土剪力墙的共同工作性能。
3.
To guarantee the safety of structural design, a small scale model for a new type of connection between steel beam and concrete shear wall was designed and tested under monotonic loading.
针对一种新型的钢梁与混凝土墙体的连接节点,设计缩小比例模型,并对其进行静载试验和有限元分析,试验结果和有限元分析结果吻合较好。
3)  connection joint
连接节点
1.
Nonlinear finite element analysis on connection joint of a super high-rise building
某超高层结构连接节点的非线性有限元分析
2.
In this article,authors introduce connection joint types between main cable and secondary cable in cable net structure.
介绍了索网结构中主次索之间的连接节点形式,并根据国内工程实践中常用的外包PE的半平行钢索的应用情况提出了有针对性的构造上的改进,同时结合工程实例进行了讨论。
3.
Combining with practical projects, the author introduce the quality control and specific construction method of connection joints between beams, slabs, walls of underground structures and underground continuous walls in construction of the "Reverse Construction Method".
结合工程实例,介绍深基础逆作法施工中地下结构的梁、板、墙与地下连续墙连接节点的具体做法及质量控制。
4)  joints [英][dʒɔint]  [美][dʒɔɪnt]
连接节点
1.
Quality control of joints reinforcement of concrete components;
混凝土构件连接节点配筋质量控制
5)  Joint [英][dʒɔɪnt]  [美][dʒɔɪnt]
连接节点
1.
As the profile steel columns are connected with reinforced concrete beam in various angles,the joints of beam steel bar with the profile steel column are quite complicated,and there are a lot of joints between the horizontal steel bar of the concealed post in the wall and the H-steel beam.
中央电视台电视文化中心主楼酒店大量的剪力墙和柱采用型钢混凝土结构,型钢柱与钢筋混凝土梁连接角度多,框架梁钢筋与型钢柱连接型式比较复杂,墙体暗柱内纵向钢筋与H型钢梁连接节点多。
2.
The temperature of joints of a certain variable cross-section portal rigid frame under local fire was simulated using finite element method.
采用有限元方法,对门式刚架梁连接节点在局部火灾作用下的温度分布进行了数值模拟分析,得到温度场分布云图及其分布规律,并与试验结果进行对比分析,为基于局部火灾下钢构件的温度场分布提供有效的有限元模拟方法。
3.
The Finite Element Analysis of the Bus Framework and the Influence to the Fatigue Life by the Form of the Joint of the Bus Framework;
然后利用BEAM4梁单元建立了供刚度强度和振动特性计算的有限元简化模型,在有限元建模过程中,合理地处理了边界条件和作用在车身骨架上的载荷,并对客车在实际运行中的水平匀速行驶,极限扭转(单轮悬空或路面不平引起的扭转),紧急制动及急转弯四种典型工况下的刚度强度进行了详尽的分析计算,对客车车身的固有振动特性进行了分析计算,并在此分析计算的基础上从客车后车门边框提出某连接节点进行了疲劳寿命分析。
6)  connection [英][kə'nekʃn]  [美][kə'nɛkʃən]
节点,连接
补充资料:电力网节点编号优化


电力网节点编号优化
network nodes order optimization

d旧nl!wong Jled一anb旧nhoo youhuo电力网节点编号优化(network nodes order。Ptimization)用稀疏矩阵技术求解电力系统网络方程时,为了节省计算机内存和加快计算速度,按照一定规则编排电力网各个节点次序。 在电力系统计算中,网络方程通常采用导纳矩阵方程的形式,它的求解多采用高斯消去法和直接三角分解等(见网络方程求解方法)。导纳矩阵是零元素很多的稀硫矩阵,对它进行消元或三角分解后所得的三角矩阵,要增加一些称为注人元的非零元素。为节约计算机内存及避免对零元素的不必要运算,在计算机中一般只贮存三角矩阵中的非零元素.因此,三角矩阵中非零元素的个数,直接影响计算机内存的需要量及程序计算速度.导纳矩阵非零元素的分布直接影响消元或分解后三角矩阵非零元素的数目.而网络节点编号次序又与导纳矩阵非零元素的分布密切相关(见图1),因此,电力网节点编号优化是求解网络方程前的一项重要工作。┌─────┬────┬─────────┬────┐│节点.号.形│导纳矩阵│消元或分解后三角阵│注入元致│├─────┼────┼─────────┼────┤│么 │麟 │魏 │弓 ││21月 │ │ │ │├─────┼────┼─────────┼────┤│上 │瀚 │魏 │l │├─────┼────┼─────────┼────┤│。~主钩 │麟 │继 │(j │└─────┴────┴─────────┴────┘ 图1节点编号对注入元的影响 ·一非零元素;X一非零注入元紊 节点编号的最优化是寻求一种使注人元素数目最少的节点编号方案.对n个节点的电力网来说,其节点编号方案可以有川种,选最优的工作量将非常大.因此,在实际中往往采取一些简化的方法对节点编号进行优化,并不一定追求“最优”。 根据消元的计算公式或星形一三角形变换规则(见图2),每消去一个节点i,新增加的元素数为八一冬Ji(J‘一,)一及 ‘(1) l、、一一洲声图2消去节点1网络变化示意图式中J‘为在消去节点i时节点i的出线数;及为在消去节点i时与节点i有连线的各节点之间已有的连线数.常用的一些节点编号优化方案,大都根据式(1)或对其作一些简化得到的,主要可分以下三类。 (l)静态按最少出线数编号。对式(1)略去八项,视去为常数,即不考虑消去前面节点对节点i的出线数的影响,因此,也称静态优化法。该方法简单、快速、应用极为普遍。 (2)动态按最少出线数编号。对式(1)略去八项,但考虑Ji的变化,即考虑消去前面节点对节点i的出线数的影响,因此,也称半动态优化法。 (3)动态按增加出线数最少编号.对式(1)考虑及项和J‘的变化,即动态按增加出线数最少的原则编号,也称动态优化法。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条