1)  strong tide
强涌潮
1.
The first stage of Xiaoshan Reclamation Engineering solved the two key problems in Qiantangjiang strong tide area with low river-bed which is always near deep-water region: one is deep water jackstone in strong tide rush area;the other is gap closure and earthwork water tight.
萧围东线治江围涂工程第一期(试验期)工程,通过科学的安排,有序的组织,合理的调度,充分挖掘现有施工力量,处理了在钱塘江强涌潮、低河床、紧临深江区域施工的二个关键问题。
2)  bore area
强涌潮区
3)  Climax tide bore
强涌潮地段
补充资料:涌潮
      见钱塘江涌潮。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。