说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 沉桩工程
1)  pile driving engineering
沉桩工程
1.
Using the theoretical analysis results for the piles in soils undergoing lateral movement and the numerical simulation based on the finite element method,the sheltering effect of previously driven piles on the soil displacements in soft soils in pile driving engineering is discussed.
采用侧向移动土中桩的理论分析结果以及有限元数值模拟,较为系统地分析了沉桩工程中已打入桩对土体侧向位移及地表隆起的遮帘作用,结果表明已打入桩对土体侧向位移的总体遮帘作用并不显著。
2)  pile-sinking construction
沉桩施工
1.
The affection of pile-sinking construction in soft soil to the excavation of succeeding foundation;
软土中沉桩施工对后续基坑开挖的影响
3)  construction pile
工程桩
1.
Pile foundation design for the test piles and anchor piles can t be used to construction pile was introduced also.
用于桩基础设计的试桩、锚桩不能用于工程桩的原因。
2.
On the basis of analysis and comparison among checking time of dead load, pile sedimentation, and pile load, it is possible to check dead load of construction piles with a quick keeping load method.
在对静载检测的观测时间与桩的沉降量和工程桩承载力判别分析对比的基础上 ,提出采用快速维持荷载法检测工程桩静荷载是可行
4)  pile foundations
桩基工程
1.
The mechanical mechanism,working behavior and deformation property of settlement-controlled composite pile foundations are analyzed;and the expressions for the pile number of the composite pile foundations are deduced.
以沉降控制复合桩基为对象,分析其受力机制、工作性态和变形特性,推导复合桩基桩数的计算公式;通过对沉降控制复合桩基沉降量的几种常规计算方法的讨论,建立计算复合桩基沉降量的实用新方法——修正实体深基础分层总和法;并用该方法计算2个沉降控制复合桩基工程的基础沉降量。
5)  engineering pile
工程桩
1.
Quality test by engineering pile stress wave reflection method;
工程桩应力波反射法检测质量的探讨
2.
This article makes an introduction of how to determine construction parameter regarding excavation safety grade and slope angle, by plan finite element analysis on bench method, and by load-bearing analysis of engineering pile.
通过对深大基坑内台阶式放坡挖土时土坡的平面有限元分析求出土坡滑移力,再通过对工程桩的受力分析得出桩身内力,判断是否会产生危害,以确定挖土时的安全坡高、坡角等施工参数。
3.
In foundation excavating,upright post piles and engineering piles form a long -short pile composite foundation.
在基坑工程中,立柱桩和工程桩形成了长短桩复合桩基础。
6)  pile foundation engineering
桩基工程
1.
The quality assurance effect of QC team in pile foundation engineering
QC小组在桩基工程中的质量保证作用
2.
Based on the pile foundation engineering in the terminal of Shanghai Pudong International Airport Phase 2,authors introduce ordered combination of PHC pipe pile and precast concrete square piles,including construction processes,and key construction technology.
结合上海浦东国际机场二期航站楼连廊和主楼桩基工程,介绍了在PHC管桩与预制方桩有序组合的大型桩基工程中施工的整个过程,以及所采用的关键施工技术措施。
3.
Based on the construction of the pile foundation engineering of large bridge in Luhong City,the construction technology of bored pile is presented after adopting pressed grounding for consolidating foundation in karst area having many cavities.
通过对芦洪市特大桥桩基工程施工的实例介绍,阐述了溶洞发育的岩溶地区,采用压力注浆处理加固地基后进行钻孔灌注桩施工技术。
补充资料:振动沉桩机
      用振动方法使桩振动而沉入地层的桩工机械。作业时,桩与周围土壤产生振动,使桩面的摩擦阻力减小,桩杆由于自重克服桩面及桩尖的阻力而穿破地层下沉,还可以利用共振原理,加强沉桩效果。
  
  沉桩机由振动器、夹桩器、传动装置、电动机等组成。主要工作装置是定向振动器,其激振部分是成对的水平转轴。在转轴上有若干块质量和形状相同的偏心块。每对转轴的偏心块对称布置,并由一对相同的齿轮传动,转速相同,转向相反,因此,两轴运转时所产生的扰动力在水平方向相互平衡抵消,防止沉桩机和桩的横向摆动,在垂直方向扰动力相互叠加,形成激振力促使桩身振动。转轴的转速可以调节,因而振动器的激振频率、振幅和振动力也是可调的,以适应各种不同规格的桩和不同性质的地层。振动器的变频有机械、气压、液压或电磁等多种方式。振动器下部是夹桩器,备有各种不同的规格尺寸,以便与各种不同截面的桩相连接,使沉桩机和桩连成一体。夹桩器的操纵有杠杆式、液压式、气压式等。
  
  冲击式振动沉桩机的振动器与夹桩器之间采用弹性联系,在振动器下面和夹桩器上面分别设有锤头和砧座。当振动器工作时,锤头不断冲击砧座,既能使桩杆产生振动,减小土壤对桩面的摩擦阻力,又能使桩杆受到纵向冲击力,克服地层对桩尖的正面阻力,加快沉桩速度。
  
  作业时,将沉桩机装于桩顶,使之连成一体,由起重机吊起就位。为了防止振动作用通过吊钩钢丝绳传到起重机构上,振动器上部的挂架中设有减振弹簧。振动沉桩机工作时,选用的频率和振幅随桩而异,一般情况下,低频大振幅适用于直径大的钢管桩和重量大的钢筋混凝土预制桩,且宜于砂石类地层施工。中高频、中幅适用于钢板桩。频率高则能和桩的自振频率产生共振,使沉桩速度快而噪声小,宜于城市施工。冲击式沉桩机适用于粘土地层。
  
  沉桩机的基本技术参数是偏心力矩、激振力和电动机的功率。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条