1) material transfer station
物资转运站
1.
As China s second-largest oversize project after Sanxia Project,Longtan Hydropower Project boasts a great consumption of such materials as cement,fly ash,steel products,and admixture,most of which are delivered to Nandan material transfer station by railway and forwarded to the construction site by car.
龙滩水电工程为我国仅次于三峡的特大型工程,水泥、粉煤灰、钢材、外加剂等主要物资材料用量巨大,这些物资大部分由铁路发往南丹物资转运站,再用汽车转运到工地。
2) transshipment station
货物转运站
3) refuse transfer station
废物转运站;垃圾转运站
4) rail head
军用物资转运的最后一站
5) freight transfer platform
货物转运站台
补充资料:和淮南李司空同转运员外(一作同转运卢员外
【诗文】:
层层高阁旧瀛洲,此地须征第一流。丞相近年萦倚望,
重才今日喜遨游。荣持健笔金黄贵,恨咽离筵管吹秋。
谁继伊皋送行句,梁王诗好郢人愁。
【注释】:
【出处】:
全唐诗:卷656-12
层层高阁旧瀛洲,此地须征第一流。丞相近年萦倚望,
重才今日喜遨游。荣持健笔金黄贵,恨咽离筵管吹秋。
谁继伊皋送行句,梁王诗好郢人愁。
【注释】:
【出处】:
全唐诗:卷656-12
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条