说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 竖向施工缝
1)  vertical construction joint
竖向施工缝
1.
Through the discussion about the method of two-time construction for the retained vertical construction joint of independent column base of cast-in-site reinforced concrete under the specified conditions,this article analyzes the retaining principle,the construction method and the load transfer mechanism of the embedded section steel,and summarizes the experiences of practical projects.
通过对特定条件下现浇钢筋混凝土柱下独立基础留置竖向施工缝分两次施工的做法进行探讨,分析了竖向施工缝的留置原则、施工方法和在竖向施工缝处埋设型钢的传力机理,总结了工程实践经验。
2)  circular construction joint
环向施工缝
1.
Experimental study on relation between width of circular construction joint and water pressure resistance of water stop in tunneling works;
隧道工程环向施工缝张开度与止水条抗水压力关系的试验研究
3)  vertical crack
竖向裂缝
1.
Dynamic analysis of nearly horizontal rock slopes with vertical cracks;
含竖向裂缝的近水平层状岩体边坡的动力学分析
2.
Analysis of and counter-measures for vertical cracks commonly seen in piers and abutments;
墩台常见的竖向裂缝原因分析及对策
3.
Analyzing the cause of vertical cracks for thin-wall abutment shaft,the paper proposed the protective measures for reference.
针对薄壁台身施工中容易出现竖向裂缝的原因做了分析总结,并根据自己在施工中的实践提出了对其裂缝的防治措施。
4)  vertical joint
竖向接缝
1.
In as much as the finished long span prestressed concrete continuous beam bridges usually constructed with segmental cantilever site cast construction method,which inherently has vertical joint between segments, its construction technology and joint quality will have significant effect on the structure of continuous rigid frame bridge.
由于已建成的大跨度预应力混凝土连续梁桥通常采用分节段悬臂浇筑施工,节段与节段之间必然要存在竖向接缝,其施工工艺和接缝质量对连续刚构桥的结构性能有明显的影响。
2.
The influence of vertical joints on post-construction deflection of continuous rigid frame bridges is discussed with the consideration of the design and construction condition.
结合设计与施工因素讨论连续刚构桥竖向接缝对成桥后期挠度的影响,同时分析了不同施工质量下竖向接缝剪切徐变对后期挠度的贡献,认为在现有条件下由竖向接缝处的剪切变形引起主梁下挠增量不容忽视,并提出了改善主梁节段间接缝的构造措施和施工中应注意的事项。
5)  Shaft construction
竖井施工
1.
According to the construction experiences of Eastern part skip Shaft construction technique of dahongshan copper mine,introduced the quickly construction technique of thousand meters shaft,analyzed and valued the construction methods,machines collocation,personal organization and construction organization.
根据大红山铜矿东部箕斗竖井工程施工经验,介绍了千米竖井快速施工技术,对竖井施工方法、机械设备配置、人员组织安排及施工组织进行分析和评价。
6)  vertically downward rotating construction
竖转施工
1.
Rotary hinges are temporary joints connecting arch ribs with the abutments of rigid frame arch bridges during the vertically downward rotating construction process.
通过对八字型刚构拱桥竖转施工过程的接触有限元模拟,研究了转动铰的局部应力分布,分析了转动铰的结构力学性能。
补充资料:混凝土施工缝


混凝土施工缝
concrete construction joint

hunningtu sh一gongfeng混凝土施工缝(eonerete construetion joint) 先后浇筑的混凝土,其间歇时间超过混凝土凝结时间所形成的接缝。浇筑混凝土应连续进行,如必须间歇,其间歇时间应尽量缩短,并在前层混凝土凝结以前,将次层混凝土浇筑完毕。超过允许的间歇时间,以致用振捣器也难以使新浇的混凝土与先浇的混凝土结合成整体时,结合面即形成施工缝。与混凝土浇筑区段一平面平行的施工缝称水平施工缝,与浇筑区段平面垂直的施工缝称垂直施工缝。 混凝土浇筑允许的间歇时间,即为混凝土凝结时间,依所用水泥品种和凝结条件而异,日本及前苏联等国家都有明确规定,中国规范规定的混凝土凝结时间见表。 浇筑混凝土的间歇时间…攀叮泣 注:1.表列数值包括混凝土运输和浇筑时间;2.当掺有 促凝或缓凝剂时,最大间歇时间需经试验确定。 混凝土施工缝是混凝土结构的薄弱环节,处理不好,会引起结构开裂、漏水及影响结构耐久性,重者甚至危及结构安全。因此,通常在混凝土结构施工方案中,应根据结构类型、浇筑数量和浇筑条件,对施工缝的留设位置、施工缝型式及继续浇筑混凝土时的技术处理等,都预先予以确定。 施工缝留设位置一般留在结构受剪力较小,且便于施工的部位。各类结构的留设位置为:(1)柱子的施工缝留设在基础的顶面,梁或吊车梁牛腿的下面、吊车梁的上面、无梁楼板柱帽的下面;(2)深度大的梁,其施工缝留设在与其相连接板底面以下20~3omm处,当板下有托梁时,则应留设在托梁底下;(3)单向板的施工缝可留设在平行于板的短边的任何位置;(4)有主次梁的楼板,宜顺着次梁方向浇筑,其施工缝应留设在次梁跨度中间1/3范围内;(5)双向受力楼板、拱壳、斗仓、蓄水池、设备基础及其他复杂的结构,其施工缝的位置应按设计要求留置,一般斗仓可留设在漏斗根部及上部,或漏斗与仓壁的交接处;地坑和水池应留设在坑壁,距坑底30~50cm范围内;(6)承受动力作用的设备基础一般不设施工缝,如必须留设时,应征得设计单位同意,一般可在互不相依的两台设备和输送辊道支架之间留设垂直施工缝;(7)当在设备基础的地脚螺栓范围内留设施工缝时,水平施工缝应留设在距螺栓底下大于150mm处(直径小于3Omm的螺栓,水平缝可留设于螺栓埋入部分总长的3/4处),垂直施工缝应留设在距螺栓中心线25omm以外并小于5倍螺栓直径处。 施工缝型式对无防水要求的构筑物可采用平直的施工缝;对有防水要求的结构物应采用企口缝、V形缝或平缝加止水板。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条