1)  calculation on amount of earthworks
土石方工程量计算
2)  Mass calculation for earth work
土石方工程计量
3)  earthwork resilience calculation
土方工程量计算
1.
The application of Excel in earthwork resilience calculation;
Excel在土方工程量计算中的应用
4)  earthworks calculation
土石方量计算
1.
Taking Dacheng-Liugezhuang 110 kV transmission line engineering as an example,of which were constructed recently by the transmission line and substation engineering company,designing idea and method for VEP program are introduced in combination with the program of earthworks calculation designed by the article writer.
以送变电工程公司最近施工的项目“大城—留各庄110 kV线路工程”为例,结合作者最近编制的土石方量计算程序介绍了VEP程序的设计思路及方法。
5)  the volume of earth and stone in building site
土石方工程量
1.
The design of the program for calculating the volume of earth and stone in building site;
总图工程土石方工程量电算程序编制
6)  earthworks computation
土石方计算
1.
The paper analyzed several influenced factors of subgrade earthworks computation for expressway.
对影响高速公路路基土石方计算的几个主要因素进行分析,参照实例讨论如何准确、合理地进行土石方数量的计算与调配。
补充资料:坦克维修工程车(见坦克保养工程车、坦克修理工程车)


坦克维修工程车(见坦克保养工程车、坦克修理工程车)
tank maintenance %26 repair vehicle