说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 加固改造方案
1)  renovation program for reinforcement
加固改造方案
2)  transformation and Strengthen design scheme
改造加固方案
3)  reinforcement and reform method
加固改造方法
1.
Taking the Jianghan first Bridge in Wuhan city as example,aiming at the current existing main diseases of this bridge,the author introduces the main reinforcement and reform methods according to the different part diseases of the bridge,and describes the main technology adopted in the bridge reinforcement and maintenance scheme,so as to accumulate experiences for the reform of similar bridge.
以武汉市江汉一桥为例,针对该桥目前存在的主要病害,介绍了对于桥梁不同部位病害采取的主要加固改造方法,并详细阐述了该桥加固维修方案中采用的主要工艺,以期为同类桥梁的改造积累经验。
4)  retrofit scheme
改造方案
1.
Analysis of external procedure and assessment of retrofit scheme of heat recovery area in Xiahuayuan power plant s HG-670/140-9 s boiler;
下花园发电厂HG-670/140-9型锅炉尾部受热面外部过程分析与技术改造方案评价
2.
To solve these problems,two retrofit schemes,with which relevant pollutant emission standards can be satisfied,are being put forward for ESPs of currently Zhungeer coal-fired power plants.
针对现役燃用准格尔煤电厂的电除尘器,提出了能够满足排放标准的改造方案:在现役电除尘器中,增设"石灰石-石膏"湿法脱硫装置,或采取"电除尘器+烟气调质"方案,同时将原有常规高压电源改成带EPIC-II型电压优化控制器的电源,以便进一步提高电除尘器运行的稳定性和节能效果。
3.
Based on the cause analysis,three retrofit schemes are presented in this paper such as adding electric fields,retrofitting to bag filters and to advanced hybrid particulate collectors.
该文首先分析了造成静电除尘器除尘效率低下的主要原因;提出3种改造方案:增加电场;改造为袋式除尘器;改造为静电袋式复合除尘器。
5)  transformation scheme
改造方案
1.
The new transformation scheme of the pump station uses the technique of the pump-contr.
选取基于前置增压泵压力和流量可调控的泵控泵(Pump-Control-Pump,简称PCP)技术改造方案,使高压注水泵工作在高效区,节能效果明显。
2.
After the covering of CATV in the villages,a disputation occurs to the villages belonging to the villagers committee,that is which scheme is better,optical fiber cable or electric cable? In view of the characteristics of HFC network in Songming County,this paper conducts checking calculations according to the related data of village HFC network transformation scheme,and then comes to a conclusion.
电视光缆联网到村委会后,在村委会以下的自然村网络改造方案的选择上存在不同的争议,采用光缆还是电缆联网方案,是新时期广播电视网络工作者面临的机遇和挑战。
3.
This paper analyzes and demonstrates the technical performance,technical characteristics and economic benefits of different transformation schemes for mine ventilation,and based on the the analysis and demonstration results,points out that the ventilation transformation scheme of changing the compound ventilation into division ventilation is feasible.
对不同的矿井通风改造方案的技术性能、技术特征和经济效益等进行了分析和论证,分析和论证表明:"改混合式通风为分区式通风"的通风改造方案切实可行。
6)  Modification scheme
改造方案
1.
Comparison and selection on capacity expansion and speed increasing modification scheme in section of Panzhihua to Yuanmou in ChengduKunming railway line
成昆线攀枝花至元谋段扩能提速改造方案比选
2.
The main problems of LKJ-93 train operation monitoring and reconding device in operation were presented,and based on the operating principle of JZ-7 air brake a practical modification scheme for existing train operation monitoring and recording device was proposed.
介绍了LKJ-93列车运行监控仪在运用中所存在的主要问题,并根据JZ-7型制动机的工作原理,提出了切实可行的改造方案。
3.
The modification scheme of reclosing breaker circuit in an 110kV unattended substation was presented compared with the original scheme.
论述已建110kV变电站无人值班重合闸回路改造方案,并与原方案进行了比较。
补充资料:基础加固改造与更换


基础加固改造与更换
strengthening reconstruction and replacement of foundation

  jichujiaQuaaizaovuaenahuan_~山,Ju回以道闷黑仪铭tre馆tnemng,recon-struetionand replaeement offoundation)确保旧有建(构)筑物基础熊正常工作所采用的技术措施。旧有建筑物基础不能正常工作的原因有:荷载改变;基础在使用期间发生过大的沉降变形;基础受腐其嵌入原有墙体中的深度为30~40cm。一般采用交替蚀、机械损伤和发生沉降裂缝或冻胀裂缝等。为保证旧分段(3~4m长度)施工法。有基础的安全使用,通常采用加固、改造和更换措施.转移荷载法将基础荷载转移到桩上,而使基础 墓础加固强度变弱的旧有建(构)筑物基础可以变成传力结构的方法。对于钢筋混凝土矩形基础,桩应采用水泥灌浆法和加固套法进行加固。加固方案可根布置在基础底面范围以内(内设桩);对于条形基础,应据旧基础的类型、基础施工质量、地下水位、建筑物结在基础两侧基底范围以外平行布置两排桩(外设桩),构、基础损伤程度、作用在基础上的荷载以及工程地质每排桩应在纵向上用承台连接起来。采用的桩可以是特点等加以选择。钢筋混凝土预制桩或钢筋混凝土组合桩(米格型桩), 水泥灌浆法在基础中钻出或凿出斜孔,斜孔直也可为灌注桩或灌浆桩(树根桩).径比灌浆管直径大2一3mm,斜孔间距沿条形基础为米格型桩由长度为80一loocm、横截面为20cmx50一IO0cm,单独基础每面不应少于2个斜孔。将灌浆20cm或3卑mX30cm、其轴线有穿通孔的预制钢筋混管插入斜孔内,用。.2~0.6MPa压力通过灌浆管将水凝土构件(桩段)组成。在承重墙下挖出宽lm、深1.sm泥浆压大。水泥浆采用300~400号水泥时的浆液稠度的地槽,地槽内设置调整梁,用设置在桩段和调整梁之为1:1(水泥:水)。条形基础灌浆加固时,可将其分间的千斤顶将桩段压入地基,并在两节桩段对头接合成若干个工作段,每个工作段的长度为2.0~2.sm。处安装连接套管。当全部桩段压入地基后,往穿通孔内 加固套法对基础可以双面或单面设置加固套。放入钢筋并灌注水泥砂浆,然后安装桩顶部构件。加固套用混凝土或钢筋混凝土制成,混凝土套可以将灌注桩宜使用钻孔灌注法施工,钻孔中的混凝土基础加宽20~30cm,钢筋混凝土套可以将基础每面采用捣锤夯实或压缩空气压实。桩身上部1.2~2.om加宽不小于15cm。为使基础加宽部分参加工作,必须高度处应配置4~5根直径12~16mm钢筋。提高其地基承载力,可以在这部分土层上铺设5一树根桩的直径为8~25cm,其施工方法是:使用旋10cm厚度碎石层或含砾石的砂层。为使加固套能与旧转钻机穿过墙体和基础并钻出垂直孔或斜孔,钻孔内有基础紧密连接,应每隔1.。一1.sm用直径Zomm钢放入由3~4根直径为10一16mm钢筋和直径小于钻筋将加固套锚固。钢筋混凝土加固套的上、下部应分孔直径10~15mm的圈形箍筋构成的钢筋骨架,然后别配置10cmx10cm、15cmxscm格孔钢筋网。加固套将灌浆管插入钻孔,并用灌浆泵通过灌浆管将水泥砂的竖筋采用轧制型钢(槽钢、角钢),其一端埋入地下浆压入钻孔。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条