1)  grid integration
并网接入
1.
This paper introduces the general situation of wind power generation throughout the world,the fundamental principles of wind power generation,the characteristics of different wind generators and current grid integration techniques.
阐述了目前国内外风力发电的概况,介绍了风力发电的基本原理,分析了不同风力发电机组和现有并网接入技术各自的特点。
2)  grid-connected
并网
1.
Design on the grid-connected PV generator with multi-tracking system;
一个多种跟踪方式的并网光伏电站
2.
Disturbance rejection controller for photovoltaic three-phase grid-connected system;
光伏三相并网系统的自抗扰控制
3.
Novel Vector Control Strategy with Active and Reactive Power Decoupling Control for Wind Power Grid-connected Inverter;
风电并网逆变器用有无功功率解耦控制的矢量控制策略
3)  cutting-in
并网
1.
Cutting-in Control of the VSCF Wind-power Generator Based on Auto-disturbance Rejection Controller;
基于自抗扰控制器的变速恒频风力发电并网控制
2.
With combination of integral variable structure control(IVSC) and field-oriented vector control technique,a control strategy was presented for smooth no-load cutting-in of variable-speed constant-frequency double-fed wind-power generator.
为了实现变速恒频双馈风力发电机平滑的接入电网,将积分型变结构控制(IVSC)与磁场定向矢量控制相结合,提出了一种空载并网控制策略。
4)  parallel connection
并网
1.
This article introduces the work principle of diesel generator set connected in parallel to municipal electric power, and in detail discusses the parallel connection which is applied in the second-stage engineering of a certain power plant.
本文介绍了柴油发电机组与市电的正并网、反并网功能的工作原理,详细讨论了在某电厂中柴油发电机组并网功能的应用。
2.
Auto Quasi Corresponding-period Equipment is designed to realize a generator’ rapid parallel connection to electrical network in a power plant.
自动准同期装置是为实现同步发电机快速并入舰船电力系统而设计的专用仪器,它能控制发电机快速满足准同期条件,从而实现准确、安全并网。
3.
The necessity of developing computerized automatic parallel connection device for power system is analyzed.
分析了研制电力系统微机化自动并网控制器的必要性,介绍了其技术关键、设计思想和实现方法。
5)  grid-connection
并网
1.
Development situation and grid-connection of distributed triple-generation in China;
中国分布式冷热电联产发展现状及其并网问题
2.
By discussing the operation areas,the paper pointed out that grid-connection control and decoupled power control were important control modes of the generator.
并网型交流励磁变速恒频风力发电系统存在不同的运行区域,各运行区域对应的控制方式有所不同。
6)  synchronization
并网
1.
Mainly analyzed are some technical problems which have existed for many years,such as synchronization delay or failure,and big close angle under synchronous pump work condition.
重点针对多年存在的并网时间长、甚至并网失败,以及抽水同期并网角度大等若干技术问题进行了分析,并提出了解决措施。
2.
The synchronization technology and test method for wind power generation system are introduced in the paper.
介绍了风力发电机组并网技术及其并网和运行试验,分析了风力发电机组并网对电网电能质量的影响,深入探讨了引起波动与闪变的机理,并详细论述了采用静止无功补偿器和感性储能装置等可减小并网风力发电机组产生的功率波动,从而达到减小电压波动和闪变。
参考词条
补充资料:发电厂接入系统设计


发电厂接入系统设计
planning of connecting power plant to system

fod一onehong 11eru xltong shel,发电厂接入系统设计(planning of eonnectingpower plant to system)论证发电厂接人系统的方案,确定与该发电厂配套的送出工程项目的系统专题设计。电力系统中期发展规划所提出的结论,可以作为发电工程的设计依据。但电力系统不断在发展,有关工程的建设进度也常有变化,因此在进行发电厂设计时,还应进行发电厂接入系统设计,以便根据当时实际情况,对有关设计方案进行校核和调整,作为编制电力建设计划及设计任务书的基础。发电、翰电及变电是一个整体,安排发电工程项目的同时要安排好配套的输电线、变电所和相应的系统继电保护、安全自动装置、调度自动化及系统通信的建设项目,统称之为发电厂送出工程。因此发电厂接人系统设计包括接人系统电力网方案设计、接人系统继电保护设计、接人系统安全自动装置设计、接人系统调度自动化设计及接人系统通信设计等5个方面。 接入系统电力网方案设计研究所设计的发电厂与电力系统的关系,分析该发电厂在电力系统中的地位及作用,确定发电厂的送电范围、出线电压等级及回路数、与电力网的连接方案等,并对发电厂电气主接线、与电力网有关的电气设备参数、发电厂运行方式等提出技术要求。其目的是为编制发电厂送出工程设计任务书提供依据,为发电厂初步设计准备条件。发电厂接人系统设计涉及的地域范围及设计重点要依据发电厂的特点而定。如为系统主力发电厂则重点研究与系统主网架有关的问题;大型水电厂则应研究扩大电力系统以充分发挥水电效益的问题;地区中小型发电厂则研究与地区电力网的关系问题。接入系统电力网方案设计的重点是电力电量平衡、接人系统方案论证及有关的电气计算。 (l)电力市场需求预测。在中国,根据有关政府部门的国民经济发展战略及目标,在审定的电力系统长期发展规划、电力系统设计等工作的基础上,提出符合《电力发展规划编制原则》及其他有关规定的负荷水平及负荷特性分析意见,对该发电厂近区负荷预测进行详细的分析工作。 (2)电力电量平衡。主要目的是:①确定所设计的发电厂的工作容量及备用容量,校核该厂的装机容量及建设进度;②研究水电厂装机容量及可发电量的利用程度,若未获充分利用则应研究扩大电力网、设置季节性用户或是减少装机容量的必要性及合理性;③确定火电厂的设备年利用小时数作为设计该厂的依据。(见电力系统电力平衡和电力系统电量平衡) (3)接人系统方案论证。根据系统运行方式分析发电厂与电力系统的功率交换情况,并根据发电厂所在电力系统的特点、发电厂所处位置,提出发电厂接人系统方案。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。