说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 贯通密度
1)  coalescence density
贯通密度
2)  holing-through accuracy
贯通精度
1.
On basis of the survey practice in Tian-Hua shield-bored running tunnel on line 3 of Guangzhou Metro,the author presents the survey works in the construction of the Shield-bored Metro tunnels,analyzes on the influence of the traverse survey accuracy on the holing-through accuracy and recommends some countermeasures to improve the holing- through accuracy.
结合广州地铁三号线[天~华]两个区问段隧道施工测量工作的实践,简述地铁盾构隧道施工中的各种测量工作,重点分析导线测量精度对隧道贯通精度的影响,以及如何采取适当的技术方法来提高测量精度。
3)  breakthrough precision
贯通精度
1.
This paper analyzes the breakthrough precision criteria of GPS straight tunnel,and discusses the interior and exterior reliability criteria of GPS point,and gives out the breakthrough precision and reliability criteria for the optimization and design of GPS network.
为直伸型隧道的 GPS平面控制网的优化设计提供了贯通精度和可靠性标准的计算公
2.
And the authors also give their own opinion on how to improve the breakthrough precision of tunnel to control underbreak and overbreak of tunnel excavation.
结合工程实践,介绍了印度尼西亚阿萨汉一级水电站引水隧洞在开挖与混凝土衬砌过程中测量的主要技术和方法,并就如何提高隧洞贯通精度、较好控制隧洞超欠挖问题提出了建议,探讨了断面收方技术在隧道围岩变形监测中的应用。
4)  joint continuity
节理贯通度
5)  failure strength
贯通破坏强度
1.
Through modifying the Lajtai’s theory,the failure strength criteria of such rock mass were proposed.
基于Lajtai和Jennings理论,研究了直剪应力状态下共面闭合非贯通节理岩体的受力特点,将非贯通节理岩体破坏分为三种模型;分析了各种模型的破坏机理;通过修正Lajtai理论,建立了非贯通节理岩体的贯通破坏强度准则。
2.
On the basis of model testing results,the deformation and fracture mechanism of brittle rockmass containing coplanar close intermittent joints under direct shear condition are analyzed,and the criteria of fracture initiation strength and failure strength of such rockmass are proposed.
根据模型试验研究结果,深入分析了直剪条件下含共面闭合断续节理岩体的变形和破坏机理,并在此基础上建立了这类岩体的初裂强度和贯通破坏强度准则,将计算结果与实测值进行了对比分析,表明两者吻合较好,证明该强度准则是合理可靠的,具有理论和工程应用价值。
6)  lateral penetrating accuracy
横向贯通精度
1.
Based on the theory of leveling error, the calculating formulas for the increment of lateral penetrating accuracy by the layout of ground and underground single guide lines added with spinning top rakes are derived strictly.
本文按照测量平差的理论,严格推证了地表、地下单导线加测陀螺边对横向贯通精度增益的计算公式,并得到了在计算机上解算的简化、实用算式,利用该算式容易求出陀螺边的最佳配置及其对横向贯通的严密估算结果,它对于地表、地下导线加测陀螺边进行隧道控制的设计和计算具有较大的参考价值。
补充资料:非密度制约因素(见密度制约因素)


非密度制约因素(见密度制约因素)


  l焦非密度制约因素见生态因素、密度制约后
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条