3) cast-in-place cantilever method
悬臂浇筑施工
1.
The paper takes a bridge as an object of the study and focuses on the research of two points including structure analysis and high-pier buckling analysis of prestressed concrete continuous rigid frame bridge in construction with the cast-in-place cantilever method.
本文以某三跨连续箱梁悬臂施工阶段的过程模拟,针对连续刚构桥悬臂浇筑施工中的结构分析方法、高墩稳定性两个方面的问题进行了深入研究。
4) moving model shelf cost construction
移模逐孔浇筑施工
5) segmental cantilever casting construction
节段悬臂浇筑施工
6) concrete casting in construction period
施工期混凝土浇筑
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。