说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 调峰电源
1)  peaking power source
调峰电源
2)  peaking units expansion planning
调峰电源规划
1.
Discussion on optimal model for peaking units expansion planning and its application;
电力系统调峰电源规划优化模型探讨及其应用
2.
Mathematically,the peaking units expansion planning problem takes into consideration with a set of equality and inequality constraints.
为了合理论证调峰电源的开发方式和效益,提出了考虑周调节抽水蓄能电站运行特点的电力系统调峰电源规划优化模型。
3)  peak heat source
调峰热源
4)  on-peak power
峰巅电源
5)  peaking generation
调峰发电
6)  load-leveling [英][ləud'levəliŋ]  [美][lod'lɛvəlɪŋ]
电站调峰
1.
The VRB projects established by UNSW、SEI、VRB Power applied on energy storage system such as solar energy, wind turbine, load-leveling and the emergency power were particularized.
概述了钒电池储能系统的发展历程及其研究现状,列举了澳大利亚新南威尔士大学(UNSW)、日本住友电工(SEI)、钒电池动力公司(VRBPower)建立的用于太阳能、风能储能及电站调峰、建筑物应急电源等不同场合的钒电池储能系统(VESS)。
补充资料:电力系统调峰


电力系统调峰
peak load following of electric power system

d一onl一x}tongt一oofeng电力系统调峰(peak load following of eleetriepowersystem)为满足电力系统日尖峰负荷铸要,对发电机组出力所进行的调整。 尖峰负荷是由于一日24小时内用电需求不均匀而形成的。一般一昼夜之内,在上午和照明时间,出现两次尖峰负荷,深夜则为用电最少的低谷负荷(仅为尖峰负荷的5。%~70%)时间。尖峰负荷持续时间相对较短。 尖峰负荷与低谷负荷的差值很大,因此要求有些发电机组在低谷负荷时停机,而在尖峰负荷到来之前迅速起动并增长出力,尖峰过后即降低出力和停机(见图)。这些机组称为尖峰负荷机组或调峰机组。它们具有起动时间短、出力变化快和可以频繁起停的性能。 必须在电力系统发展规划中列入调峰措施,决定选用机组类别,根据系统运行需要对其建成进度妥善安排。具体措施有:①采用水电机组调峰。②采用抽水抽水留能机组所发电力黔乡茱 的次。租峨喇钧份一舰尖峰负祠机组所发电力抽水公能御幽拍水中间负蔺机组所发电力,一一一一一一一一一一、、、___,羞本负蔺机组所发电力12 16幼24 时序,时 调峰示意图蓄能机组调峰,低谷负荷时抽水,尖峰负荷时发电。此措施具有显著的调峰效益。③采用专门调峰的火电机组。①对已装常规火电机组进行改进,使之降低最低允许出力或能每日开停而实行两班制运行等,以减轻尖峰负荷和低谷负荷差值大所引起的调峰困难。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条