说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 轻型井点降水
1)  light well point drainage
轻型井点降水
1.
Application of light well point drainage in anti-slide treatment of deformable earth body;
轻型井点降水在土质变形体抗滑治理中的应用
2.
Application of light well point drainage in right bank dike construction of Nenjiang river;
轻型井点降水在嫩右工程施工中的应用
3.
On application of light well point drainage in excavation of bearing platform of foundation pits
轻型井点降水在承台基坑开挖中的应用
2)  super-light equipment for water level lowering
超轻型井点降水
3)  vacuum light well precipitation
真空轻型井点降水
1.
It specifically analyses the construction problems of bridge deep foundation ditch excavation in the section of earthquake liquefied soft soil area,puts forward the programs of vacuum light well precipitation,steel tube pile fender and the composition of them to solve the damages of sand-blast boil and landslide that easily happened in the construction.
详细分析了地震液化带软土地区桥梁深基坑开挖的施工问题,提出了真空轻型井点降水、钢管桩围堰和两者相结合的方案来解决施工过程中可能出现的喷砂冒水和滑坡等灾害,试验结果表明,用该方法进行深基坑开挖支护是十分有效的。
4)  vacuum reservoir
轻型井点排水
5)  light well point
轻型井点
1.
Application of light well point precipitation in engineering;
轻型井点降水在工程中的应用
2.
In Zhengzhou Zhongfu square construction,the foundation pit is dewatered by light well point and tubular well together and supported by soil nail wall and concrete-drilling pile;the construction result proves to be effective.
文章结合郑州中孚广场工程施工实际,采用轻型井点与管井结合进行基坑降水,土钉墙与混凝土灌注桩结合进行基坑支护,取得了较好的施工效果。
3.
In the light of the Project practice the paper introduces the arrangement method of the light well point of sandy soil foundation.
对于降水深度不大的砂性土地基 ,一般选用轻型井点降水 ,可以满足安全、适用、经济的要求。
6)  light well points
轻型井点
1.
The article systematically summarizes the ways of downgrading ground water with the use of light well points during construction of the basement according to the experience of the national defense project.
根据国防工程地下施工的体会,系统总结了地下室基坑土方挖掘施工中轻型井点降低地下水位的方法,对其他高层建筑地下室基坑土方挖掘施工具有较大参考意义。
补充资料:井点降水法


井点降水法
lowering the water table by well point

  Ji叩d仰J心戊笋浏fo井点降水法(lowering the water table by we-n一point)预先将井筒穿过的含水层通过用钻孔进行疏干,然后掘进井筒的施工技术。在不稳定的含水岩层中开凿井筒时,在预定的井筒周围凿出钻孔,利用钻孔抽水或往下放水,使地下水位降落,疏干含水层。然后,在疏干区内进行井筒掘砌作业。井点降低地下水位的方法有抽水法和放水法.前者利用深井泵或潜水泵从井筒周围钻孔中抽水,使水位降低,形成疏干区。(见图)后者在井筒断面内凿出钻孔(滤水孔),使地下水经滤水孔流人下部已开凿的巷道内,再转排至地面。抓 井点降水示意图 1一井筒;2一抽水孔.3一地下原有静水位, 4一深井泵.5一抽水时静水位 钻孔抽水法是在比井筒掘进直径大4m的布孔圈径上钻3~6个直径为100~500mm的钻孔,其深度以进人不透水层中2~4m为宜。随着钻凿孔的进行在钻孔中安设好保孔管,保孔管上钻有直径为5~15mm的小孔,包扎好金属过滤网,以防止砂粒进人撼管内磨损水泵或使孔壁坍塌.钻孔抽水时,孔内的水位急剧降低,形成水位最低点.外部围岩中的水,因存在水位差而流向孔内,水位降低较大,而远离钻孔的水流阻力则增大,因此水位降低较小,从而形成降水漏斗,满足了疏干要求。 矿井降水孔的涌水量多为30~loom,/h,主要含水层的水位降低值可达几十米。当含水岩层渗透系数大于3m/d时,井点降水法较为有效。井点降水法通常不能使水位降低到含水层的最低深度处,在隔水层上部有一段井筒的水没有被疏干称为残余水柱。必要时需要采取其他措施(如板桩法)来保证该段井筒的掘砌施工。 井点降低水位可使土体密实,引起结构上的土压力增高和地面下沉,应注意防止不均匀沉降。当含水砂层厚度不大、粘土夹层不超过两层,有良好渗透性时,宜采用钻孔抽水法。 (张著超)
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条