1) rolling layers
浇筑层
1.
In this paper,the analytic solutions for one-dimensional temperature field of multi-layer thin plate structure are proposed by Laplace transform and superposition principle,where the differences of pouring time and heat of hydration emitting time between rolling layers are co.
碾压混凝土浇筑层的初始温度和绝热温升是碾压混凝土坝设计中的常见问题之一,直接关系到温度场仿真计算的精度和计算量问题。
2) lift joint
浇筑层面
3) concrete lift thickness
浇筑层厚度
1.
In order to ensure that Ertan Hydropower Station generates power on time,during Ertan arch dam construction period,the contractor suggested to change the dam concrete lift thickness to speed up the construction progress,i.
为保证二滩水电站按期发电,在二滩拱坝施工期,承包商提出了改变大坝混凝土浇筑层厚度加快施工进度的计划,即浇筑层厚度由1。
4) Concrete lift
混凝土浇筑层
5) casting
浇筑
1.
On casting technology of large inclination oblique beam concrete;
浅谈大倾角斜梁混凝土的浇筑技术
2.
Key technologies of large equipment foundation are discussed,such as opening and blocking construction,whole and partition casting,and large area deep precipitation as well as fast construction.
对大型设备基础施工几个重大关键问题,如敞开与封闭施工、整块与分块浇筑、大面积深层降水、快速施工等进行探讨,提出合理界限方案和措施。
6) pouring
浇筑
1.
The foundation quality control of Haihe Bridge before concrete pouring;
天津海河大桥基础混凝土浇筑前的质量控制
2.
Elementary probing into the application of underwater pouring concrete;
水下浇筑混凝土应用初探
3.
Regarding the pouring of big volume concrete;
关于大体积混凝土的浇筑
参考词条
补充资料:层层加码
1.谓逐级增加任务和逐级提出各种要求等。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。