说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 水利事业预算项目
1)  budget projects of water sector
水利事业预算项目
2)  government budget project
行政事业性预算项目
1.
Studies on expert review system for central government budget project of water sector;
浅议水利中央级行政事业性预算项目专家评审制度的完善
3)  project budget
项目预算
1.
The basic units that undertakes the projects of mineral resource geological survey have a lot of problems in the project budget management, such as lack the basic data for working out the project budget, do not pay enough attention to management of the basic statistic data, goal of the budget is only for budget and etc.
承担国土资源地质调查项目的基层单位在项目预算管理工作中存在着诸多问题,例如,缺乏编制项目预算的基础资料,对基础数据统计管理不够重视,为预算而预算等。
2.
Based on a summary of the experiences of constituting land development and consolidation project budget, this paper discusses the factors influencing budget quality in land development and consolidation projects, and proposes measures to improve the budget quality.
在总结国家投资土地开发整理项目预算编制经验的基础上,论述了影响土地开发整理项目预算质量的因素,并提出提高预算质量的有关措施。
3.
The subject includes: (1) Project definition, including project phases and tasks; (2) Project budget maintenance; (3) How to collect the cost and revenue through ERP modules; (4) Analyze and control variance between project budget and actual cost.
因此如何有效地运用软件来实现项目的管理,并有机的和现有的ERP系统相结合,成为了目前许多企业应用软件供应商所急需解决的一个课题,这其中包括以下几点:(1)项目各个阶段以及任务的定义;(2)项目预算的维护;(3)ERP子模块中产生的收入和费用的维护;(4)项目预算和实际费用之间的分析和控制。
4)  budget item,budget items
预算项目
5)  water project
水利项目
1.
Environmental evaluation issue of water project;
水利项目的环境评价问题
2.
Audit of ecosystem is an effective way of scientifically evaluating ecological, social and economic benefits of water project and necessity of solving water problems in China as well as alternation of water management concept.
水利生态绩效审计是科学地评价水利项目生态效益、社会效益和经济效益的有效手段,是我国资源环境问题凸显和治水思路转变的必然要求。
6)  water conservancy project
水利项目
1.
Study on TOT Applied in Semi-commonweal Water Conservancy Project;
TOT在准公益性水利项目中的应用研究
2.
This paper Talks about the features of water conservancy projects and some factors in economic evaluation that should be taken into consideration, and puts forward some problems needing attention in the evaluation.
论述了水利项目的特点及其经济评价中应考虑的因素,提出了评价时应注意的一些问题。
3.
Through studying and using the experiences of project follow-up evaluation in China for reference,the status quo of follow-up evaluation research of water conservancy projects in China is elaborated,and the theories and methods of follow-up evaluation of water conservancy projects are discussed preliminarily.
本文在学习和借鉴国内有关项目后评价的基础上,阐述了我国水利项目后评价的研究现状,并对水利项目后评价的理论和方法进行了初步探讨,总结我国水利建设项目后评价的发展现状,分析我国目前水利建设项目后评价存在的问题,指出评价内容和侧重点随项目的特点而有所不同;注重全过程的评价;评价方法越来越科学;后评价机制逐渐完善等水利建设项目后评价的发展趋势。
补充资料:建设项目预算


建设项目预算


建设项目预算预测某个建设项目全部建设费用的经济文件,是设计概算和施工图预算的总称。中国的一般工程项目设计分两个阶段进行:在初步设计阶段,主要是通过编制设计概算,估计全部工程建设费用;在施工图设计阶段,主要是通过编制施工图预算,确定全部工程建设费用。如果是采用三阶段设计,则在技术设计阶段,编制修正总预算,即修正设计概算。建设项目预算包括以下主要内容:①生产项目、附属生产及服务用工程项目、生活福利设施项目的某单项工程综合预算。②建设单位的基建管理费和生产人员培训费等的单项费用综合预算。③为工程施工服务的临时性生产和生活设施、特殊施工机械购置费用预算。建设项目预算主要由以下几项费用组成:建筑工程费用和设备安装工程费用;设备购置费用,即工具、器具及生产用具购置费用;其他工程费用等等。它又称总概算,是该工程投资的最高限额。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条