说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 逆作法施工方案
1)  reversed construction
逆作法施工方案
1.
The influential factors of the optimum selection in reversed construction methods was analyzed.
针对影响深基坑逆作法施工方法选择的因素进行分析,在模糊数学原理基础上运用层次分析法,建立了逆作法施工方案模糊层次评价模型。
2)  inversed construction method
逆作施工方法
1.
Continuous concrete wall is used in the air shaft structure,which is built with inversed construction method by using inner liner and transverse frame.
风井采用地下连续墙围护结构,通过内衬及横向框架逆作施工方法实现。
3)  reverse construction
逆作法施工
1.
Through construction Practice of reverse construction of underground structure, This article describes the technology of foundation pit supporting , earthwork,formwork,steel bars and concrete works and monitoring in the construction,Control measures of cracks of concrete and quality control measures of stability of pit are also be described.
通过地下结构的逆作法施工实践,对施工中基坑支撑、土方开挖、模板、钢筋、混凝土工程等的施工监测技术,以及地下室逆施中混凝土裂缝控制、基坑安全的各项质量保证措施进行了介绍。
4)  top-down construction
逆作法施工
1.
the paper introduces the top-down construction principles,its classification,technique direction and construction method.
针对高层建筑日益增多的趋势,为了安全施工和环境效益,介绍了逆作法施工的原理、分类、工艺特点以及逆作法施工方案
5)  top-down construction method
逆作法施工
1.
The following protection measures of construction were adopted on the side of subway in Shanghai Changfeng Commercial Mart that top-down construction method was taken: making the diaphragm walls thicker,delaminating and division and excavating orderly in excavation engineering,reinforcing in pit,remaining rational obligating width of soils near diaphragm walls and excavating the obligating soils.
上海长峰商城超大型基坑逆作法施工期间在临近地铁侧采取了如下施工保护措施:加厚围护结构地下连续墙、分层分区并按一定的顺序开挖、坑内加固、留设预留土体以及对预留土体开挖等;实测数据的分析结果表明:这些施工保护措施使临近地铁侧地下连续墙的水平变形大大减小,仅相当于非地铁侧的40。
2.
The top-down construction method is an effective method.
逆作法施工中在地下连续墙内侧留设合理的预留土体,采用盆式开挖可以提高机械挖土效率,加快挖土速度,也是控制地下连续墙变形的一个有效方法。
6)  half against method
半逆作法施工
1.
The half against method construction organizes and the quantity supervises and control;
半逆作法施工组织及质量监控
补充资料:施工企业技术组织措施计划(见施工企业技术)


施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise

施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条