1)  (0-1) integer Programming
(0-1)整数目标规划
2)  0-1 integer multiple-objective programming
0-1整型多目标规划
3)  0-1 integer programming
0-1整数规划
1.
New method for solving a kind of 0-1 integer programming problem——Chaotic searching algorithm;
求解一类0-1整数规划问题的新方法——混沌搜索算法
2.
Optimization design of high-strength bolts connection based on 0-1 integer programming;
基于0-1整数规划的高强螺栓连接优化设计
3.
This paper formulates the satellite imaging scheduling problem as a 0-1 integer programming model,which is NP complete.
建立了卫星成像调度问题的0-1整数规划模型,该问题具有NP完全特性。
4)  0-1 integral programming
0-1型整数规划
1.
Considering the given missiles and special operation intention, the author builds a mathematical model by 0-1 integral programming to determine which targets should be prior to hit.
针对给定弹量和特定作战意图对打击目标进行优化选择问题,运用0-1型整数规划,建立合理的数学模型并确定最优打击目标。
5)  0~1 integral programming
0~1整数规划
6)  0-1 mixed integer programming
0-1整数规划
补充资料:目标规划
      对多目标或相互矛盾的多重目标进行择优的一种方法,是企业根据现有财力、物力、人力、技术设备等条件,通过分析、比较和论证,对企业经营方向、经营目标所进行的规划。其目的是充分有效地利用企业的资源和条件,争取节约,消除浪费,以提高企业的经济效益。
  
  目标规划是以线性规划为基础而发展起来的,但在运用中,由于要求不同,有不同于线性规划之处:①目标规划中的目标不是单一目标而是多目标,既有总目标又有分目标。根据总目标建立部门分目标,构成目标网,形成整个目标体系。制定目标时应注意协调各个分目标,消除分目标间的矛盾,以利总目标的实现;各分目标必须服从总目标的实现,不能脱离总目标。②线性规划只寻求目标函数的最优值,即最大值或最小值。而目标规划,由于是多目标,其目标函数不是寻求最大值或最小值,而是寻求这些目标与预计成果的最小差距,差距越小,目标实现的可能性越大。目标规划中有超出目标和未达目标两种差距。一般以Y+代表超出目标的差距,Y-代表未达目标的差距。Y+和Y-两者之一必为零,或两者均为零。当目标与预计成果一致时,两者均为零,即没有差距。人们求差距,有时求超过目标的差距,有时求未达目标的差距。目标规划的核心问题是确定目标,然后据以建立模型,求解目标与预计成果的最小差距。
  
  目标规划可用一般线性规划求解,也可用备解法求解,还可用单体法求解,或者先用线性规划或备解法求解后,再用单体法验证有无错误。目标规划有时还要用对偶原理进行运算,依一般规则,将原始问题转换为对偶问题,以减少单体法运算步骤。
  
  在企业中,目标规划的用途极为广泛,如确定利润目标,确定各种投资的收益率,确定产品品种和数量,确定对原材料、外购件、半成品、在制品等数量的控制目标等。
  