1)  cost
造价费用
2)  cost
造价
1.
Simple Talking about Valid Control of Building Engineering Cost;
浅谈建设工程造价的有效控制
2.
Proposal for concrete cost valuation under modern concrete structural technology;
对现代混凝土结构技术下混凝土造价计量的建议
3)  fabrication cost
造价
1.
A comparison of the fabrication cost and annual running cost between the water source heat pump system with three purposes and air-cooled chiller plus gas-fired boiler system is made with an engineering example, and the former has a better economy.
结合工程实例,对一机三用型水源热泵系统与风冷式冷水机组+燃气锅炉系统的造价及年运行费进行了比较,前者的经济性较优。
2.
The comparison of the four roof structures is made on steel amount and fabrication cost.
本文主要针对造船工业单层厂房屋盖结构形式中采用最多的平面梯形钢屋架屋盖结构形式,实腹式钢梁加托架的屋盖结构形式,空间网架屋盖结构形式,单向锥形倒三角形截面管桁架屋盖结构形式等屋盖结构形式进行分析研究,并对此四种屋盖结构形式的每平方米用钢量、造价等进行分析比较。
4)  Construction cost
造价
1.
The research of construction cost control in design phase of project;
建设项目工程造价在设计阶段的控制研究
2.
Some common problems existing in construction cost control of centralized heating engineering and their forming causes are analyzed,and the control countermeasures for the construction cost are discussed.
分析了集中供热工程造价控制中存在的一些普遍问题及形成原因,对工程造价的控制对策进行了探讨。
5)  building cost
造价
1.
Analysis on percentage of reinforcement in building cost;
建筑造价中钢筋比例分析
2.
It is a new topic for building cost management to conduct process cost control for the government-invested project.
对政府投资建设项目实施全过程造价控制是当前工程造价管理的新课题,文章通过笔者从事政府投资项目全过程造价控制的工作体会,对如何运用技术、经济、法律手段进行全过程造价控制作出初步探讨和分析,旨在推动全过程造价控制在政府投资项目中的运用,提高项目投资的经济效益和社会效益。
3.
From six aspects,the measures for reducing the building costs in present stage are proposed in this paper.
随着城市交通量的迅增,地铁建设的发展迫在眉睫,但地铁工程的高造价限制了地铁建设的发展速度和规模。
6)  project cost
造价
1.
Reforms in the field of project cost have been carried out with the reformation of China s economic system, especially with the transformation of investment management system and construction management system.
我国工程造价的改革是随着我国经济体制,特别是投资管理体制和建筑业管理体制的转变而进行的。
2.
This paper illustrates measures on project cost control during the preparation of highway con-struction, e.
阐述了通过提高勘察设计质量、控制征地拆迁费用和地方材料价格、选择有利于造价控制的合同形式等途径,以实现控制造价的目标。
3.
Project cost management is defined as to employ administrant means, such as scientific and technical theory, economy and law to tackle the practical issues during the activity of project construction, including the definition and control of project cost, technology and economy, as .
工程造价管理是指遵循工程造价运动的客观规律和特点,运用科学、技术原理和经济及法律等管理手段,解决工程建设活动中的工程造价确定与控制,技术与经济,经营与管理等实际问题,力求合理使用人力、物力和财力,达到提高投资效益和经济效益的全部业务行为和组织活动。
参考词条
补充资料:保险的费用(含施救费用与救助费用)


保险的费用(含施救费用与救助费用)


  保险的费用(含施救费用与救助费用)保险人即保险公司承保的费用。即当保险标的物遭遇保险责任范围内的事故时,除了能使货物本身受到损毁导致经济损失外,还会产生费用方面的损失,这种费用保险人也给予赔偿。 可保险的费用主要有以下几种:①施救费用。指在国际货物运输保险中,发生承保责任内的事故或自然灾害,被保险人或者他的代理人、雇用人员为防止损失扩大而进行抢救行为所支出的合理费用。保险人对这种施救费用,负责赔偿,以鼓励被保险人对货物积极抢救。②救助费用。保险标的物发生承保责任范围内的自然灾害或意外事故,由保险人和被保险人以外的第三者来解救危险,获救方应该向救助方支付相应的费用,这种费用就是救助费用。它属于共同海损的费用支出。③特别费用。指运输工具遭遇海难后,在避难港由于卸货所引起的损失,以及在中途港、避难港由于卸货、存仓及运送货物所产生的费用。这种费用也属于保险人赔付范囿。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。