说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 不良地质体
1)  harmful geologic body
不良地质体
2)  diminutive ill geologic bodies
小型不良地质体
3)  unfavorable geological condition
不良地质
1.
According to the unfavorable geological conditions in Wuqiaoling, from landslide, dangerous rock and other aspects the difficulties in expanding planning caused by geological issues are analyzed; at the same time corresponding treatment measures are proposed according to the anticipated environmental geological problems in double line engineering.
针对乌鞘岭地段不良地质的分布情况 ,从滑坡、顺层斜坡、崩塌落石等方面 ,分析了该地质情况对展线工程的影响 ,提出二线修建后可能引起的环境地质问题的处理方
2.
The paper summarizes the engineering geologic and hydrogeologic condition along the Shanghai Chongming Tunnel and analyses the unfavorable geological condition and its solution in the site.
对上海崇明越江隧道工程沿线的工程地质和水文地质条件进行概略总结,并对场地内的不良地质及其对策进行了分析评价。
3.
The unfavorable geological conditions around and in front of the working face in tunnel engineering will cause collapse of tunnel and surge of underground water resulting in tremendous causalities and equipment damage.
隧道掌子面前方和周围的不良地质条件极易引起隧道塌方、涌水,导致人员伤亡、设备毁坏、工期延误,造成重大损失,因此需要采取合理的超前地质预报方法对可能发生地质灾害进行预报。
4)  Poor geology
不良地质
5)  bad geology
不良地质
1.
RS technology for bad geology distribution regularity of Shaanxi provincial freeway;
陕西省高速公路不良地质分布规律遥感调查
2.
Research on the bad geology and collapse construction technology of Shang Hu-yu tunnel
上虎峪隧道不良地质及塌方施工技术研究
3.
Taking the pile foundation construction of Pangjiawan Bridge as an example, the article introduces in detail the comparison and selection of the foundation schemes, the treatment scheme of limestone cave and the optimized scheme of pile foundation construction, and preliminarily approaches the treatment scheme of the pile foundation under the condition of the bad geology.
该文以庞家湾大桥桩基施工为例,详细介绍了基础方案的比选、溶洞的处理方案及桩基施工优化方案,初步探讨了桩基不良地质情况下的处治方案。
6)  unfavorable geology
不良地质
1.
The processing method to unfavorable geology of the hejiapuzi tunnel exit in yuanzhou,Guyuan,Ningxia;
宁夏固原市原州区何家堡子隧洞出口不良地质处理方法
2.
The different kinds of everfrost and unfavorable geology are introduced,the considerations during the everfrost roadbed and unfavorable geology construction are given combined with Qumalai-Budongquan highway of Qinghai-Tibet Plateau;the measures taken in the everfrost roadbed construction are proposed.
从多年冻土及不良地质的划分入手,结合青藏高原曲麻莱—不冻泉公路的施工,对多年冻土地区路基及不良地质施工的注意事项进行了介绍,同时给出了多年冻土地区路基施工采取的工程措施,为同类工程施工提供了宝贵经验。
3.
Monitoring measurement,as one significant means to ensure security,optimize design,guide construction,its technological progress exerts a vital influence on unfavorable geology\'s tunnel construction.
随着我国城市交通建设快速发展,地铁隧道数量不断增加,隧道施工遇到的不良地质问题越来越多。
补充资料:常染色体隐性遗传型少汗性外胚层发育不良综合征


常染色体隐性遗传型少汗性外胚层发育不良综合征


本病为常染色体隐性遗传,但据观察其临床表现不能与X连锁遗传者相区别,自然病程也与之相似,只是臭鼻症(恶臭,化脓性鼻分泌物排出)更重。其父母均正常。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条